Abstract
This paper presents the critical factors that constitute a successful deployment of the dimensional management system (DMS) methodology in manufacturing industries. DMS refers to a process by which the whole integrated product development (i.e. conception, design, manufacturing and inspection) is systematically defined and monitored to meet predetermined dimensional quality goals. A deep research on academic literature was performed to raise 26 factors considered critical for a successful DMS implementation. Professionals who work in this area were surveyed about the importance of each factor, both in a conceptual view and degree of application of this same factor according to their experience. The survey was conducted in two different approaches to provide a clear comparison between these two contrasting aspects. After that, a management model that considers the top-rated factors obtained from the survey results, analysed by statistical multidimensional tools, is proposed. The factor importance/application ranking is a preliminary model which aims at offering a starting point for researchers concerned in continuing this analysis or to offer a guide for industries interested in this methodology.
Similar content being viewed by others
References
Womack JP, Jones DT, Ross D, Roos D (1990) The machine that changed the world. Rawson, New York
Hicks BJ, Culley SJ, Allen RD, Mullineux G (2002) A framework for the requirements of capturing, storing and reusing information and knowledge in engineering design. Int J Inf Manage 22:263–280. doi:10.1016/S0268-4012(02)00012-9
Taylor P, Akkermans HA, Van Wassenhove LN, Van Wassenhove LN, Taylor P, Akkermans HA, Van Wassenhove LN (2013) Searching for the grey swans: the next 50 years of production research. Int J Prod Res 51:6746–6755. doi:10.1080/00207543.2013.849827
Henzold G, Henzold G (2006) Geometrical dimensioning and tolerancing for design, manufacturing and inspection a handbook for geometrical product specifications using ISO and ASME standards. Butterworth-Heinemann, Oxford; Burlington, MA
Jeffreys D (2006) Developing dimensional management for the assembly of aircraft structures
Drake P (1999) Dimensioning and tolerancing handbook
Sharma SKS, Sharma SKS, Gupta RRD, Kumar A, Singh B (2011) Supplier issues for lean implementation. Int J Eng Sci Technol 3:3900–3905
Thornton AC Variation Risk Management: Focusing Quality Improvements in Product Development and Production. http://www.wiley.com/WileyCDA/WileyTitle/productCd-0471446793.html. Accessed 5 Feb 2016
Hung H-F, Kao H-P, Ku K-C (2006) Evaluation of design alternatives in collaborative development and production of modular products. Int J Adv Manuf Technol 33:1065–1076. doi:10.1007/s00170-006-0548-9
Skander A, Roucoules L, Klein Meyer JS (2007) Design and manufacturing interface modelling for manufacturing processes selection and knowledge synthesis in design. Int J Adv Manuf Technol 37:443–454. doi:10.1007/s00170-007-1003-2
Nguyen VD, Martin P (2015) Product design-process selection-process planning integration based on modeling and simulation. Int J Adv Manuf Technol 77:187–201. doi:10.1007/s00170-014-6446-7
Haleem A, Sushil QMA, Kumar S (2012) Analysis of critical success factors of world-class manufacturing practices: an application of interpretative structural modelling and interpretative ranking process. Prod Plan Control 23:722–734. doi:10.1080/09537287.2011.642134
Rockart J (1982) The changing role of the information systems executive: a critical success factors perspective
Bullen C, Rockart J (1981) A primer on critical success factors
Hasan MAA, Shankar RBSJCSADAAA, Hasan MA, Shankar R, Sarkis J, Suhail A, Asif S (2009) A study of enablers of agile manufacturing. Int J Ind Syst Eng 4:407–430. doi:10.1504/IJISE.2009.024069
Jasurda D (2011) The correlation of as-manufactured products to as-designed specifications: closing the loop on dimensional quality results to engineering predictions. doi: 10.4271/2011-01-2569
Hausch E, Carlos P, Hauscha E, Kaminski PC (2010) Systematics for development of dimensional characteristics of automotive industry products. Prod Manag Dev 8:93–106
Jasurda D (2012) Dimensional engineering and tolerance analysis : do it right the first time. doi: 10.4271/2012-01-0949
Brown S, Blackmon K (2005) Aligning manufacturing strategy and business-level competitive strategy in new competitive environments: the case for strategic resonance. J Manag Stud 42:793–815. doi:10.1111/j.1467-6486.2005.00519.x
Ombasic N, Zare D (2013) Methods and tools for a dimensional engineering process at Scania
Fortune J, White D, Jugdev K, Walker D (2011) Looking again at current practice in project management. Int J Manag Proj Bus 4:553–572. doi:10.1108/17538371111164010
Andrade E (2010) Gerenciamento De Conflitos Em Projetos. http://www.labceo.com.br/bibliografia/archive/files/d7f8df754785a2248c9a5809858495e5.pdf. Accessed 19 Jul 2015
Lee DJ, Thornton AC (1996) The identification and use of key characteristics in the product development process
Yang K, El-Haik BS (2003) Design for Six Sigma. McGraw-Hill New York
Chen J, Damanpour F, Reilly RR (2010) Understanding antecedents of new product development speed: a meta-analysis. J Oper Manag 28:17–33. doi:10.1016/j.jom.2009.07.001
Frechette SP, Jones AT, Fischer BR (2013) Strategy for testing conformance to geometric dimensioning & tolerancing standards. Procedia CIRP 10:211–215. doi:10.1016/j.procir.2013.08.033
Maropoulos PGG, Ceglarek D (2010) Design verification and validation in product lifecycle. CIRP Ann Manuf Technol 59:740–759. doi:10.1016/j.cirp.2010.05.005
Santos SEC dos, Pinto FMBD, Jorge RL, Humberto F da SF DA (2013) “Outsourcing” como Ferramenta Estratégica de Gestão Empresarial: situação de algumas empresas do Vale do Paraíba. Rev. Gestão Tecnol 1
Steinkellner S (2011) Aircraft vehicle systems modeling and simulation under uncertainty. 1–52
Linderman K, Schroeder RG, Zaheer S, Choo AS (2003) Six Sigma : a goal-theoretic perspective. 21:193–203
Scatolin AC (2005) Aplicação da metodologia Seis Sigma na redução das perdas de um processo de manufatura. São Paulo
Torminato SM, Novaski O (2004) Analise da utilização da ferramenta CEP : um estudo de caso na manufatura de autopeças. http://www.bibliotecadigital.unicamp.br/document/?code=vtls000343360. Accessed 4 Oct 2015
Baldo CR (2003) A Interação entre o Controle de Processos e a Metrologia em Indústrias de Manufatura
Oliveira SM De (2007) a Gestão De Programas De Desenvolvimento : Aplicação De Confiabilidade , Mantenabilidade E Segurança
Bluvband Z, Grabov P, Nakar O (2004) Expanded FMEA (EFMEA). In: Annu. Symp. Reliab. Maint. 2004 - RAMS. pp 31–36
Stamatis DH (2003) Failure mode and effect analysis: FMEA from theory to execution. ASQ Quality Press
Petter A, Ola I (2008) Manufacturing system to support design concept and reuse of manufacturing experience. In: Manuf. Syst. Technol. New …. Springer, pp 137–140
Zirger BJ, Hartley JL (1996) The effect of acceleration techniques on product development time. IEEE Trans Eng Manag 43:143–152. doi:10.1109/17.509980
Chen IJ, Paulraj A (2004) Understanding supply chain management: critical research and a theoretical framework. Int J Prod Res 42:131–163. doi:10.1080/00207540310001602865
Gerwin D (1993) Manufacturing flexibility: a strategic perspective. Manage Sci 39:395–410. doi:10.1287/mnsc.39.4.395
Muelaner JE, Maropoulos P (2011) Integrated dimensional variation management in the digital factory. University of Bath, pp 39–46
Krogstie L, Ebro M, Howard TJ (2014) How to implement and apply robust design: insights from industrial practice. Total Qual Manag Bus Excell:1–19 doi: 10.1080/14783363.2014.934520
Cassettari CE, Batocchio A, Marcondes AB (2005) Lean manufacturing and Six Sigma. Warrendale, PA
Malhotra NK (2001) Pesquisa de Marketing: uma orientação aplicada. Bookman Editora
Rea LMM, Parker RAA (1992) Designing and conducting survey research
Gil AC (1987) Como Elaborar Projetos de Pesquisa. Atlas, São Paulo
Campbell DT, Stanley CJ (1979) Delineamentos Experimentais e quase experimentais de pesquisa. 1–138
Cronbach L (1951) Coefficient alpha and the internal structure of tests. Psychometrika
García JL, Rivera DG, Iniesta AA (2013) Critical success factors for Kaizen implementation in manufacturing industries in Mexico. Int J Adv Manuf Technol 68:537–545. doi:10.1007/s00170-013-4750-2
Brah SA, Chong W-K (2004) Relationship between total productive maintenance and performance. Int J Prod Res 42:2383–2401. doi:10.1080/00207540410001661418
Tavakol M, Dennickn R (2011) Making sense of Cronbach’s alpha. Int J Med Educ 53–55
Flynn BB, Flynn EJ (2005) Synergies between supply chain management and quality management: emerging implications. Int J Prod Res 43:3421–3436. doi:10.1080/00207540500118076
Hair JF, Black WC, Babin BJ, Anderson RE, Tatham RL (2009) Análise multivariada de dados - 6ed. Bookman Editora
Gliem RR, Gliem JA (2003) Calculating, interpreting, and reporting Cronbach’s alpha reliability coefficient for Likert-TYPE Scales
Hair J, Black W, Babin B, Anderson R, Tatham R (2006) Multivariate data analysis
Siebert J, Kunz R (2015) Developing and validating the multidimensional proactive decision-making scale. Eur J Oper Res. doi:10.1016/j.ejor.2015.06.066
Anholon R, Sano AT (2015) Analysis of critical processes in the implementation of lean manufacturing projects using project management guidelines. Int J Adv Manuf Technol. doi:10.1007/s00170-015-7865-9
Pestana MHM, Gageiro JJN (2003) Análise de dados para ciências sociais: a complementaridade do SPSS
Laros JA (2012) O Uso da Análise Fatorial: Algumas Diretrizes para Pesquisadores. Análise Fatorial para Pesqui:141–166
Alwin D, Krosnick J (1985) The measurement of values in surveys: a comparison of ratings and rankings. Public Opin Q 49:535–552. doi:10.1086/268949
Cohen J (1992) Statistical power analysis. Curr Dir Psychol Sci:98–101
Hair JF (2014) A primer on partial least squares structural equations modeling (PLS-SEM). SAGE, Los Angeles
Myatt G (2007) Making sense of data: a practical guide to exploratory data analysis and data mining. Wiley-Interscience, Hoboken, N.J
Author information
Authors and Affiliations
Corresponding author
Additional information
An erratum to this article is available at http://dx.doi.org/10.1007/s00170-016-9207-y.
Rights and permissions
About this article
Cite this article
Teoi, A.Y., Anholon, R., da Silva, D. et al. Critical factors for the dimensional management system (DMS) implementation in manufacturing industries. Int J Adv Manuf Technol 88, 1053–1063 (2017). https://doi.org/10.1007/s00170-016-8824-9
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00170-016-8824-9