Skip to main content
Log in

Scheduling the replenishment of just-in-time supermarkets in assembly plants

  • Regular Article
  • Published:
OR Spectrum Aims and scope Submit manuscript

Abstract

In recent years, many OEMs, especially in the automotive industry, have installed so-called supermarkets on their shopfloors to feed parts to assembly lines in a flexible and just-in-time manner. Supermarkets are small logistics areas within the factory where parts are intermediately stored to be transferred, often in the form of presorted kits, to nearby workstations frequently and in small lots. While this greatly alleviates inventory concerns at the assembly line, care must be taken that the supermarket itself always be adequately stocked. In this paper, we tackle the problem of determining when which part types should be taken from central receiving storage to the supermarket in what quantities, such that, on the one hand, shopfloor traffic remains manageable, while, on the other hand, inventory costs are not excessive. We formalize the problem, investigate the computational complexity, and develop a bounding procedure as well as a heuristic decomposition approach. Computational tests show that our procedures work very well on instances of realistic size. Moreover, we study the tradeoff inherent in the problem between delivery frequency and in-process inventory.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4

Similar content being viewed by others

References

  • Akbalik A, Kebe S, Penz B, Sbihi N (2008) Exact methods and a heuristic for the optimization of an integrated replenishment-storage planning problem. Int Trans Oper Res 15:195–214

    Article  Google Scholar 

  • Akbalik A, Penz B, Rapine C (2015) Capacitated lot sizing problems with inventory bounds. Ann Oper Res 229:1–18

    Article  Google Scholar 

  • Bartholdi JJ, Hackman ST (2008) Allocating space in a forward pick area of a distribution center for small parts. IIE Trans 40:1046–1053

    Article  Google Scholar 

  • Bartholdi JJ, Hackman ST (2014) Warehouse and distribution science, release 0.96. Internet. http://www.warehouse-science.com. Accessed 21 Oct 2015

  • Battini D, Faccio M, Persona A, Sgarbossa F (2010) “Supermarket warehouses”: stocking policies optimization in an assembly-to-order environment. Int J Adv Manuf Technol 50:775–788

    Article  Google Scholar 

  • Battini D, Boysen N, Emde S (2013) Just-in-time supermarkets for part supply in the automobile industry. J Manag Control 24:209–217

    Article  Google Scholar 

  • Boysen N, Fliedner M, Scholl A (2008) Sequencing mixed-model assembly lines to minimize part inventory cost. OR Spectr 30:611–633

    Article  Google Scholar 

  • Boysen N, Scholl A, Wopperer N (2012) Resequencing of mixed-model assembly lines: survey and research agenda. Eur J Oper Res 216:594–604

    Article  Google Scholar 

  • Boysen N, Emde S, Hoeck M, Kauderer M (2015) Part logistics in the automotive industry: decision problems, literature review and research agenda. Eur J Oper Res 242:107–120

    Article  Google Scholar 

  • Dixon PS, Poh CL (1990) Heuristic procedures for multi-item inventory planning with limited storage. IIE Trans 22:112–123

    Article  Google Scholar 

  • Drexl A, Kimms A (1997) Lot sizing and scheduling-survey and extensions. Eur J Oper Res 99:221–235

    Article  Google Scholar 

  • Emde S, Fliedner M, Boysen N (2012) Optimally loading tow trains for JIT-supply of mixed-model assembly lines. IIE Trans 44:121–135

    Article  Google Scholar 

  • Emde S, Boysen N (2012a) Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines. Eur J Oper Res 217:287–299

    Google Scholar 

  • Emde S, Boysen N (2012b) Optimally locating in-house logistics areas to facilitate JIT-supply of mixed-model assembly lines. Int J Prod Econ 135:393–402

    Article  Google Scholar 

  • Fathi M, Alvarez MJ, Hassani Mehraban F, Rodriguez V (2014) A multiobjective optimization algorithm to solve the part feeding problem in mixed-model assembly lines. Math Probl Eng 2014:2014

    Article  Google Scholar 

  • Fisher ML, Ittner CD (1999) The impact of product variety on automobile assembly operations: empirical evidence and simulation analysis. Manag Sci 45:771–786

    Article  Google Scholar 

  • Frazelle EH, Hackman ST, Passy U, Platzman LK (1994) The forward–reserve problem. In: Ciriani T, Leachman R (eds) Optimization in industry, vol 2. Wiley, Hoboken

    Google Scholar 

  • Garey MR, Johnson DS (1979) Computers and intractability: a guide to the theory of NP-completeness. W. H. Freeman and Company, New York

    Google Scholar 

  • Gendreau M, Hertz A, Laporte G (1994) A tabu search heuristic for the vehicle routing problem. Manag Sci 40:1276–1290

    Article  Google Scholar 

  • Glover F (1977) Heuristic for integer programming using surrogate constraints. Decis Sci 8:156–166

    Article  Google Scholar 

  • Golz J, Gujjula R, Gunther H-O, Rinderer S, Ziegler M (2012) Part feeding at high-variant mixed-model assembly lines. Flex Serv Manuf J 24:119–141

    Article  Google Scholar 

  • Gu J, Goetschalckx M, McGinnis LF (2010) Solving the forward–reserve allocation problem in warehouse order picking systems. J Oper Res Soc 61:1013–1021

    Article  Google Scholar 

  • Gutiérrez J, Colebrook M, Abdul-Jalbar B, Sicilia J (2013) Effective replenishment policies for the multi-item dynamic lot-sizing problem with storage capacities. Comput Oper Res 40:2844–2851

    Article  Google Scholar 

  • Hackman ST, Platzman LK (1990) Near-optimal solution of generalized resource location problems with large capacities. Oper Res 38:902–910

    Article  Google Scholar 

  • Hackman ST, Rosenblatt MJ, Olin JM (1990) Allocating items to an automated storage and retrieval system. IIE Trans 22:7–14

    Article  Google Scholar 

  • Hertz A (1992) Finding a feasible course schedule using tabu search. Discret Appl Math 35:255–270

    Article  Google Scholar 

  • Hogg R (2015) Skoda: simply clever logistics. Automotive logistics magazine, Internet. http://www.automotivelogisticsmagazine.com/intelligence/skoda-simply-clever-logistics. Accessed 21 Oct 2015

  • Karimi B, Ghomi SF, Wilson JM (2003) The capacitated lot sizing problem: a review of models and algorithms. Omega 31:365–378

    Article  Google Scholar 

  • Klier TH, Rubenstein JM (2008) Who really made your car?: restructuring and geographic change in the auto industry. W.E. Upjohn Institute for Employment Research, Kalamazoo

    Book  Google Scholar 

  • Lasdon LS, Terjung RC (1971) An efficient algorithm for multi-item scheduling. Oper Res 19:946–969

    Article  Google Scholar 

  • Limère V, Van Landeghem H, Goetschalckx M, Aghezzaf E-H, McGinnis LF (2012) Optimising part feeding in the automotive assembly industry: deciding between kitting and line stocking. Int J Prod Res 50:4046–4060

    Article  Google Scholar 

  • Minner S (2009) A comparison of simple heuristics for multi-product dynamic demand lot-sizing with limited warehouse capacity. Int J Prod Econ 118:305–310

    Article  Google Scholar 

  • Monden Y (2011) Toyota production system: an integrated approach to just-in-time, 4th edn. CRC Press, Boca Raton

    Google Scholar 

  • Ohno T (1988) Toyota production system: beyond large-scale production. CRC Press, Boca Raton

    Google Scholar 

  • Saigal R (1968) Letter to the editor—A constrained shortest route problem. Oper Res 16:205–209

    Article  Google Scholar 

  • Taylor LJ III (1999) A simulation study of WIP inventory drive systems and their effect on financial measurements. Integr Manuf Syst 10(5):306–315

  • Vaidyanathan BS, Matson JO, Miller DM, Matson JE (1999) A capacitated vehicle routing problem for just-in-time delivery. IIE Trans 31:1083–1092

    Google Scholar 

  • Van den Berg JP, Sharp GP, Gademann AJRM, Pochet Y (1998) Forward–reserve allocation in a warehouse with unit-load replenishments. Eur J Oper Res 111:98–113

    Article  Google Scholar 

  • Walter R, Boysen N, Scholl A (2013) The discrete forward-reserve problem—allocating space, selecting products, and area sizing in forward order picking. Eur J Oper Res 229:585–594

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Simon Emde.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Emde, S. Scheduling the replenishment of just-in-time supermarkets in assembly plants. OR Spectrum 39, 321–345 (2017). https://doi.org/10.1007/s00291-016-0455-x

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00291-016-0455-x

Keywords

Navigation