A Web-Based System for Interface Management of Metro Equipment Engineering

  • Published:
Journal of Intelligent & Robotic Systems Aims and scope Submit manuscript

Abstract

In recent years, a variety of equipment automatic control systems have been applied to Chinese new metro projects such as Integrated Supervisory Control System(ISCS), Building Automation System(BAS), Fire Alarming System(FAS), etc. As with the improvement of automation in metro equipment engineering, the number of physical interfaces between sub-systems, the complexity of interface technology, the number of responsibility interfaces between different participants have increased dramatically. Traditional approaches for interface management (IM) such as interface communication meetings or interface related documents cannot adapt to modern automation level in metro equipment engineering any more. However, it remains quite common that the owners of metro projects are inexperienced in interface management and lack of standard IM approaches and effective IM tools. In order to improve the efficiency of IM and reduce the IM risks by minimizing the cost for interface conflicts and interface reworks, this paper comes up with an integrated interface model (IIM) which extracts interface information from scattered technical documents and then identifies, classifies and expresses the interface information again through structured and standardized format according to practical interface information requirement. Besides, the model proposes approaches to calculate the exact value of matching degree for technical interface and to track responsibility interface information during the whole construction stage. Based on IIM, the development and application of a web-based integrated interface management system (WIIMS) is presented in the study. The application of this system can provide technical guidance; information sharing and decision support for IM and further facilitates process control for the construction of metro equipment engineering.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Lin, Y.C.: Construction network-based interface management system. Automat. Constr. 30, 228–241 (2013)

    Article  Google Scholar 

  2. Tian, X.: Influencing Factors for Project Interface Management 448-456. American Society of Civil Engineers (2013)

  3. Al-Hammad, A.: Interface Problems between Owners and Maintenance Contractors in Saudi Arabia. J. Perform. Constr. Facil. 9(3), 194–205 (1995). doi:10.1061/(ASCE)0887-3828(1995)9:3(194)

    Article  Google Scholar 

  4. Al-Hammad, A., Al-Hammad, I.: Interface Problems between Building Owners and Designers. J. Perform. Constr. Facil. 10(3), 123–126 (1996). doi:10.1061/(ASCE)0887-3828(1996)10:3(123)

    Article  Google Scholar 

  5. Al-Hammad, A.: Common Interface Problems among Various Construction Parties. J. Perform. Constr. Facil. 14(2), 71–74 (2000). doi:10.1061/(ASCE)0887-3828(2000)14:2(71)

    Article  Google Scholar 

  6. Nooteboom, U.: Interface, management improves on-time, on-budget delivery of megaprojects. J. Pet. Technol. 56(8), 32–34 (2004)

    Article  Google Scholar 

  7. Chen, Q., Reichard, G., Beliveau, Y.: Interface management-a facilitator of lean construction and agile project management

  8. Chen, Q.: An Object Model Framework for Interface Management in Building Information Models. ProQuest Dissertations and Theses (2007)

  9. Wideman, R.M.: Wideman Comparative Glossary of Project Management Terms. http://www.maxwideman.com/pmglossary/PMG_I03.htm (2010)

  10. Harrison, P., Hamilton, B.A.: An overview of interface management, New York, NY, USA, 2004. In: Proceedings of the 2004 ASME/IEEE Joint Rail Conference (IEEE Cat. No.04CH-37550). ASME (2004)

  11. Archibald, R.D. (ed.) Managing high-technology programs and projects. Wiley, New York (2003)

  12. Critsinelis, A.: The modern field development approach, Rio de Janeiro, Brazil, 2001. Proceedings of the International Conference on Offshore Mechanics and Arctic Engineering - OMAE. Am. Soc. Mech. Eng., 391–399 (2001)

  13. Pavitt, T., Gibb, A.: Interface Management within Construction: In Particular, Building Facade. J. Constr. Eng. Manag. 129(1), 8–15 (2003). doi:10.1061/(ASCE)0733-9364(2003)129:1(8)

    Article  Google Scholar 

  14. J. Laan, L.W.P.K.: Dynamic interface management in transport infrastructure project. Paper presented at the Proceedings of the 2nd European Systems Engineering Conference, Munich, Germany

  15. Chan, W., Chen, C., Messner, J., Chua, D.: Interface Management for China’s Build-Operate-Transfer Projects. J. Constr. Eng. Manag. 131(6), 645–655 (2005). doi:10.1061/(ASCE)0733-9364(2005)131:6(645)

    Article  Google Scholar 

  16. Yun, S., Mulva, S., O’Brien, W.: A Quantitative Approach for Measuring Managerial Interfaces in the Development of a Capital Project 1410-1419. American Society of Civil Engineers (2012)

  17. Shokri, S., Safa, M., Haas, C., Haas, R., Maloney, K., MacGillivray, S.: Interface Management Model for Mega Capital Projects 447-456. American Society of Civil Engineers (2012)

  18. Kelly, B., Berger, S.: Interface management: Effective communication to improve process safety. J. Hazard. Mater. 130(3), 321–325 (2006)

    Article  Google Scholar 

  19. Senthilkumar, V., Varghese, K., Chandran, A.: A web-based system for design interface management of construction projects. Automat. Constr. 19(2), 197–212 (2010)

    Article  Google Scholar 

  20. Chen, Q., Reichard, G., Beliveau, Y.: Multiperspective Approach to Exploring Comprehensive Cause Factors for Interface Issues. J. Constr. Eng. Manag. 134(6), 432–441 (2008). doi:10.1061/(ASCE)0733-9364(2008)134:6(432)

    Article  Google Scholar 

  21. Senthilkumar, V., Varghese, K.: Case Study-Based Testing of Design Interface Management System. J. Manage Eng. 29(3), 279–288 (2012). doi:10.1061/(ASCE)ME.1943-5479.0000150

    Article  Google Scholar 

  22. Xu, J., Liu, Z., Li, Y., Wang, X.: Risk Identification of Logistics Outsourcing Based on Interface Management 2199-2204. American Society of Civil Engineers (2007)

  23. Chua, D., Godinot, M.: Use of a WBS Matrix to Improve Interface Management in Projects. J. Constr. Eng. Manag. 132(1), 67–79 (2006). doi:10.1061/(ASCE)0733-9364(2006)132:1(67)

    Article  Google Scholar 

  24. Siao, F.C., Lin, Y.C.: Enhancing construction interface management using multilevel interface matrix approach. J. Civ. Eng. Manag. 18(1), 133–144 (2012)

    Article  Google Scholar 

  25. Weshah, N., Ghandour, W.E., Jergeas, G., Falls, L.C.: Factor analysis of the interface management (IM) problems for construction projects in Alberta. Can. J. Civ. Eng. 40(9), 848–860 (2013). doi:10.1139/cjce-2012-0531

    Article  Google Scholar 

  26. Chen, Q., Reichard, G., Beliveau, Y.: Object Model Framework for Interface Modeling and IT-Oriented Interface Management. J. Constr. Eng. Manag. 136(2), 187–198 (2009). doi:10.1061/(ASCE)CO.1943-7862.0000120

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to L. Y. Ding.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Ju, Q.Q., Ding, L.Y. A Web-Based System for Interface Management of Metro Equipment Engineering. J Intell Robot Syst 79, 577–590 (2015). https://doi.org/10.1007/s10846-014-0121-y

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10846-014-0121-y

Keywords

Navigation