Skip to main content
Log in

Task assignment with start time-dependent processing times for personnel at check-in counters

  • Published:
Journal of Scheduling Aims and scope Submit manuscript

Abstract

This paper addresses a task assignment problem encountered by check-in counter personnel at airports. The problem consists of assigning multiskilled agents to a sequence of tasks in check-in counters. Because each task’s ending time is fixed to comply with the flight schedule, its processing time depends on the arrival of the assigned agents. We propose a mixed-integer program and a branch-and-price algorithm to solve this problem. We exploit the problem structure to efficiently formulate the pricing problems and improve computation time. Using real-world data from a German ground-handling agency, we conduct numerical studies to evaluate the performance of the proposed solutions.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5

Similar content being viewed by others

References

  • Barnhart, C., Johnson, E. L., Nemhauser, G. L., Savelsbergh, M. W., & Vance, P. H. (1998). Branch-and-price: Column generation for solving huge integer programs. Operations Research, 46(3), 316–329.

    Article  Google Scholar 

  • Bode, C., & Irnich, S. (2014). The shortest-path problem with resource constraints with (k,2)-loop elimination and its application to the capacitated arc-routing problem. European Journal of Operational Research, 238(2), 415–426.

    Article  Google Scholar 

  • Campbell, G. M. (1999). Cross-utilization of workers whose capabilities differ. Management Science, 45(5), 722–732.

    Article  Google Scholar 

  • Campbell, G. M., & Diaby, M. (2002). Development and evaluation of an assignment heuristic for allocating cross-trained workers. European Journal of Operational Research, 138(1), 9–20.

    Article  Google Scholar 

  • Caseau, Y., & Koppstein, P. (1992). A cooperative-architecture expert system for solving large time/travel assignment problems. In Database and expert systems applications (pp. 197–202). Vienna: Springer.

  • Choi, E., & Tcha, D.-W. (2007). A column generation approach to the heterogeneous fleet vehicle routing problem. Computers and Operations Research, 34(7), 2080–2095.

    Article  Google Scholar 

  • Cordeau, J.-F., Desaulniers, G., Desrosiers, J., Solomon, M. M., & Soumis, F. (2001). The VRP with time windows. In P. Toth & D. Vigo (Eds.), The vehicle routing problem (pp. 157–193). Philadelphia: Society for Industrial and Applied Mathematics.

    Google Scholar 

  • Cordeau, J.-F., Laporte, G., Pasin, F., & Ropke, S. (2010). Scheduling technicians and tasks in a telecommunications company. Journal of Scheduling, 13(4), 393–409.

    Article  Google Scholar 

  • Corominas, A., Olivella, J., & Pastor, R. (2010). A model for the assignment of a set of tasks when work performance depends on experience of all tasks involved. International Journal of Production Economics, 126(2), 335–340.

    Article  Google Scholar 

  • Corominas, A., Pastor, R., & Rodríguez, E. (2006). Rotational allocation of tasks to multifunctional workers in a service industry. International Journal of Production Economics, 103(1), 3–9.

    Article  Google Scholar 

  • Dantzig, G. (1954). A comment on edie’s “Traffic Delays at Toll Booths”. Journal of the Operations Research Society of America, 2(3), 339–341.

    Article  Google Scholar 

  • Desrochers, M., Desrosiers, J., & Solomon, M. M. (1992). A new optimization algorithm for the vehicle routing problem with time windows. Operations Research, 40(2), 342–354.

    Article  Google Scholar 

  • Dohn, A., Kolind, E., & Clausen, J. (2009). The manpower allocation problem with time windows and job-teaming constraints: A branch-and-price approach. Computers and Operations Research, 36(4), 1145–1157.

    Article  Google Scholar 

  • Dror, M. (1994). Note on the complexity of the shortest path models for column generation in VRPTW. Operations Research, 42(5), 977–978.

    Article  Google Scholar 

  • Edison, E., & Shima, T. (2011). Integrated task assignment and path optimization for cooperating uninhabited aerial vehicles using genetic algorithms. Computers and Operations Research, 38(1), 340–356.

    Article  Google Scholar 

  • Eveborn, P., Flisberg, P., & Rönnqvist, M. (2006). LAPS CARE—an operational system for staff planning of home care. European Journal of Operational Research, 171(3), 962–976.

    Article  Google Scholar 

  • Feillet, D., Dejax, P., Gendreau, M., & Gueguen, C. (2004). An exact algorithm for the elementary shortest path problem with resource constraints: Application to some vehicle routing problems. Networks, 44(3), 216–229.

    Article  Google Scholar 

  • Ferland, J. A., & Michelon, P. (1988). The vehicle scheduling problem with multiple vehicle types. Journal of the Operational Research Society, 39(6), 577–583.

    Article  Google Scholar 

  • Gleave, S. D. (2010). Possible revision of Directive 96/67/EC on access to the groundhandling market at Community airports. London.

  • Irnich, S., Desaulniers, G., & Solomon, M. M. (2005). Shortest path problems with resource constraints. Column Generation, 6730, 33–65.

    Article  Google Scholar 

  • Jiang, J., Ng, K. M., Poh, K. L., & Teo, K. M. (2014). Vehicle routing problem with a heterogeneous fleet and time windows. Expert Systems with Applications, 41(8), 3748–3760.

    Article  Google Scholar 

  • Kovacs, A. A., Parragh, S. N., Doerner, K. F., & Hartl, R. F. (2012). Adaptive large neighborhood search for service technician routing and scheduling problems. Journal of Scheduling, 15(5), 579–600.

    Article  Google Scholar 

  • Krishnamoorthy, M., Ernst, A. T., & Baatar, D. (2012). Algorithms for large scale shift minimisation personnel task scheduling problems. European Journal of Operational Research, 219(1), 34–48.

    Article  Google Scholar 

  • Li, Y., Lim, A., & Rodrigues, B. (2005). Manpower allocation with time windows and job-teaming constraints. Naval Research Logistics (NRL), 52(4), 302–311.

    Article  Google Scholar 

  • Liang, T. T., & Buclatin, B. B. (1988). Improving the utilization of training resources through optimal personnel assignment in the U.S. Navy. European Journal of Operational Research, 33(2), 183–190.

    Article  Google Scholar 

  • Liberatore, F., Righini, G., & Salani, M. (2010). A column generation algorithm for the vehicle routing problem with soft time windows. 4OR, 9(1), 49–82.

    Article  Google Scholar 

  • Lieder, A., Moeke, D., Koole, G., & Stolletz, R. (2015). Task scheduling in long-term care facilities: A client-centered approach. Operations Research for Health Care, 6, 11–17.

    Article  Google Scholar 

  • Liu, C., Yang, N., Li, W., Lian, J., Evans, S., & Yin, Y. (2013). Training and assignment of multi-skilled workers for implementing seru production systems. The International Journal of Advanced Manufacturing Technology, 69(5–8), 937–959.

    Article  Google Scholar 

  • Loucks, J. S., & Jacobs, F. R. (1991). Tour scheduling and task assignment of a heterogeneous work force: A heuristic approach. Decision Sciences, 22(4), 719–738.

    Article  Google Scholar 

  • Lübbecke, M. E., & Desrosiers, J. (2005). Selected topics in column generation. Operations Research, 53(6), 1007–1023.

    Article  Google Scholar 

  • Miller, J. L., & Franz, L. S. (1996). A binary-rounding heuristic for multi-period variable-task-duration assignment problems. Computers and Operations Research, 23(8), 819–828.

    Article  Google Scholar 

  • Olivella, J., Corominas, A., & Pastor, R. (2013). Task assignment considering cross-training goals and due dates. International Journal of Production Research, 51(3), 952–962.

    Article  Google Scholar 

  • Pessoa, A., Uchoa, E., & Poggi de Aragão, M. (2009). A robust branch-cut-and-price algorithm for the heterogeneous fleet vehicle routing problem. Networks, 54(4), 167–177.

    Article  Google Scholar 

  • Smet, P., Wauters, T., Mihaylov, M., & Berghe, G. V. (2014). The shift minimisation personnel task scheduling problem: A new hybrid approach and computational insights. Omega, 46, 64–73.

  • Solomon, M. M. (1987). Algorithms for the vehicle routing and scheduling problems with time window constraints. Operations Research, 35(2), 254–265.

    Article  Google Scholar 

  • Solomon, M. M., & Desrosiers, J. (1988). Survey paper—time window constrained routing and scheduling problems. Transportation Science, 22(1), 1–13.

    Article  Google Scholar 

  • Stolletz, R. (2010). Operational workforce planning for check-in counters at airports. Transportation Research Part E: Logistics and Transportation Review, 46(3), 414–425.

    Article  Google Scholar 

  • Stolletz, R., & Zamorano, E. (2014). A rolling planning horizon heuristic for scheduling agents with different qualifications. Transportation Research Part E: Logistics and Transportation Review, 68, 39–52.

    Article  Google Scholar 

  • Tsang, E., & Voudouris, C. (1997). Fast local search and guided local search and their application to British Telecom’s workforce scheduling problem. Operations Research Letters, 20(3), 119–127.

    Article  Google Scholar 

  • Yang, R. (1996). Solving a workforce management problem with constraint programming. In The 2nd international conference on the practical application of constraint technology (pp. 373–387). The Practical Application Company Ltd.

  • Zamorano, E., & Stolletz, R. (2017). Branch-and-price approaches for the multiperiod technician routing and scheduling problem. European Journal of Operational Research, 257(1), 55–68.

Download references

Acknowledgements

This research was supported by the Erich-Becker-Stiftung, a foundation of Fraport AG. The authors are grateful to the anonymous referees for helpful and constructive suggestions.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Emilio Zamorano.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Zamorano, E., Becker, A. & Stolletz, R. Task assignment with start time-dependent processing times for personnel at check-in counters. J Sched 21, 93–109 (2018). https://doi.org/10.1007/s10951-017-0523-3

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10951-017-0523-3

Keywords

Navigation