Skip to main content
Log in

Transient Analysis of an M/M/1 Queueing System Subjected to Multiple Differentiated Vacations, Impatient Customers and a Waiting Server with Application to IEEE 802.16E Power Saving Mechanism

  • Published:
Indian Journal of Pure and Applied Mathematics Aims and scope Submit manuscript

Abstract

An M/M/1 queueing system subjected to multiple differentiated vacations, customer impatience and a waiting server is analyzed. The explicit transient probabilities of system size are derived using probability generating function technique, Laplace transform, continued fractions and some properties of confluent hypergeometric function. Further, the time-dependent mean and variance are obtained as the performance measures. A numerical example is presented in order to study the behavior of the system.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. S. Alouf, E. Altman, and A.P. Azad. Analysis of an M/G/1 queue with repeated inhomogeneous vacations application to IEEE 802.16e power saving (Research Report RR-6488). INRIA, (2008).

    Google Scholar 

  2. E. Altman and U. Yechiali, Analysis of customers’ impatience in queues with server vacation, Queueing Systems, 52(4) (2006), 261–279.

    Article  MathSciNet  Google Scholar 

  3. E. Altman and U. Yechiali, Infinite server queues with systems’ additional task and impatient customers, Probability in the Engineering and Informational Sciences, 22(4) (2008), 477–493.

    Article  MathSciNet  Google Scholar 

  4. S. I. Ammar, Transient analysis of an M/M/1 queue with impatient behavior and multiple vacations, Applied Mathematics and Computation, 260 (2015), 97–105.

    Article  MathSciNet  Google Scholar 

  5. S. I. Ammar, Transient solution of an M/M/1 vacation queue with a waiting server and impatient customers, Journal of the Egyptian Mathematical Society, 25 (2017), 337–342.

    Article  MathSciNet  Google Scholar 

  6. R. Arumuganathan and S. Jeyakumar, Steady state analysis of a bulk queue with multiple vacations, setup times with N-policy and close down times, Applied Mathematical Modelling, 29(10) (2005), 972–986.

    Article  Google Scholar 

  7. Y. Baba, Analysis of a G/M/1 queue with multiple working vacations, setup times with N-policy and close down times, Performance Evaluation, 63(2) (2005), 201–209.

    Google Scholar 

  8. A. M. Baker, C. Kyun Ng, N. K. Noordin, A. Mustafaand, and A. Akbari, An optimized energy saving mechanism in IEEE 802:16e Mobile WiMAX systems, Journal of High Speed Networks, 17 (2008), 147–161.

    Article  Google Scholar 

  9. J. Boxma, S. Schlegel, and U. Yechiali, A note on an M/G/1 queue with a waiting server timer and vactions, American Mathematical Society translations, 207(2) (2002), 25–35.

    MATH  Google Scholar 

  10. M. Deruyck, W. Vereecken, E. Tanghe, W. Joseph, M. Pickavet, L. Martens, and P. Demeester, Comparison of power consumption of mobile WiMAX, HSPA and LTE access networks, in Conf. on Telecommunications Internet and Media Techno Economics (CTTE), 2010.

    Google Scholar 

  11. B. Doshi, Queueing systems with vacations-A survey, Queueing Systems, 1 (1986), 29–66.

    Article  MathSciNet  Google Scholar 

  12. I. Gradshteyn, I. Ryzhik, A. Jeffery, and D. Zwillinger, Table of Integrals, Series, and Products, 7, Academic Press, Elsevier, (2007).

    Google Scholar 

  13. O. C. Ibe and O. A. Isijola, M/M/1 multiple vacation queueing systems with differentiated vacations, Modelling and Simulation in Engineering, 6 (2014), 1–16.

    Article  Google Scholar 

  14. Indra and Renu, Transient analysis of Markovian queueing model with Bernoulli schedule and multiple working vacation, International Journal of Computer Applications, 20(2) (2011), 43–48.

    Google Scholar 

  15. K. Kalidass, J. Gnanaraj, S. Gopinath, and K. Ramanath, Transient analysis of anM/M/1 queue with a repairable server and multiple vacations, International Journal of Mathematics in Operational Research, 6(2) (2014), 193–216.

    Article  MathSciNet  Google Scholar 

  16. K. Kalidass and K. Ramanath, Time dependent analysis of M/M/1 queue with server vacations and a waiting server, In: The 6th international Conference on Queueing Theory and Network Applications, QTNA’11, Seoul, Korea, (2011), 77–83.

    Google Scholar 

  17. K. Kalidass and K. Ramanath, Transient analysis of an M/M/1 queue with multiple vacations, Pakistan Journal of Statistics and Operation Research, 10(1) (2014), 121–130.

    Article  MathSciNet  Google Scholar 

  18. L. Kong and D. H. K. Tsang, Performance study of power saving classes of type I and II in IEEE 802.16e, in Proceedings 2006 31st IEEE Conference on Local Computer Networks, Tampa, FL, USA, 14–16 Nov. 2006.

    Google Scholar 

  19. Y. Levy and U. Yechiali, Utilization of idle time in M/G/1 queueing system, Management Science, 22(2) (1975), 202–211.

    Article  Google Scholar 

  20. L. Lorentzen and H. Waadeland, Continued fractions with applications, 3, Elsevier, Amsterdam, (1992).

  21. R. Padmavathy, K. Kalidass, and K. Ramanath, Vacation queues with impatient customers and a waiting server, International Journal of Latest Trends in Engineering and Technology, 1 (2011), 10–19.

    Google Scholar 

  22. N. Perel and U. Yechiali, Queues with slow servers and impatient customers, European Journal of Operational Research, 21(1) (2010), 247–258.

    Article  MathSciNet  Google Scholar 

  23. M. Pickavet, W. Vereecken, S. Demeyer, P. Audenaert, B. Vermeulen, C. Develder, D. Colle, B. Dhoedt, and P. Demeester, Worldwide energy needs for ICT: The rise of power-aware networking, in 2008 IEEE ANTS Conference, Bombay, India, December 2008.

    Google Scholar 

  24. J. B. Seo, S. Q. Lee, N. H. Park, H.W. Lee, and C. H. Cho, Performance analysis of sleep mode operation in IEEE 802:16e, In Proc. of IEEE VTC 2004-Fall, volume 2, Los Angeles, California, USA, September 2004, 1169–1173.

    Google Scholar 

  25. L. D. Servi and S. G. Finn, M/M/1 queues with working vacations (M/M/1/WV), Performance Evaluation, 50(1) (2002), 41–52.

    Article  Google Scholar 

  26. R. Sudhesh and L. F. Raj, Computational analysis of stationary and transient distribution of single server queue with working vacation, In: Krishna P. V., Babu M. R., Ariwa E. (Eds) Global Trends in Computing and Communication Systems. Communications in Computer and Information Science, 269, Springer, Berlin, Heidelberg, (2012).

    Google Scholar 

  27. H. Takagi, Queueing anlysis: A foundation of performance evaluation 1, 1, North-Holland, Amsterdam, (1991).

  28. N. Tian and Z. Zhang, Vacation queueing models-Theory and applications, Springer-Verlag, (2006), New York.

    Book  Google Scholar 

  29. K. V. Vijayashree and B. Janani, Transient analysis of an M/M/1 queue with multiple exponential vacation and N-policy, Pakistan Journal of Statistics and Operation Research, 11(4) (2015), 587–600.

    Article  MathSciNet  Google Scholar 

  30. K. V. Vijayashree and B. Janani, Transient analysis of an M/M/1 queueing system subject to differentiated vacations, Quality Technology and Quantitative Management, 15(6) (2018), 730–748.

    Article  Google Scholar 

  31. D. Wu and H. Takagi, M/G/1 queue with multiple working vacations, Quality Technology and Performance Evaluation, 63(7) (2006), 654–681.

    Article  Google Scholar 

  32. D. Y. Yang and Y. Y. Wu, Transient behavior analysis of a finite capacity queue with working breakdowns and server vacations, In: Proceedings of the International Multi-Conference of Engineers and Computer Scientists, 2, Hong Kong, (2014).

  33. U. Yechiali, On the Mx/G/1 queue with a waiting server and vacations, Sankhya, 66 (2004), 1–17.

    MathSciNet  MATH  Google Scholar 

  34. D. Yue, W. Yue, and G. Xu, Analysis of customers impatience in an M/M/1 queue with working vacations, Journal of Industrial and Management Optimization, 8(4) (2012), 895–908.

    Article  MathSciNet  Google Scholar 

  35. S. Zhu, Z. Ma, and L. Wang, A delay-aware auto sleep mode operation for power saving WiMAX, In: Proceedings of 16th International Conference on Computer Communications and Networks (ICCCN 2007), IEEE, Honolulu, HI, USA, (2007), 997–1001.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to M. I. G. Suranga Sampath.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Suranga Sampath, M.I.G., Kalidass, K. & Liu, J. Transient Analysis of an M/M/1 Queueing System Subjected to Multiple Differentiated Vacations, Impatient Customers and a Waiting Server with Application to IEEE 802.16E Power Saving Mechanism. Indian J Pure Appl Math 51, 297–320 (2020). https://doi.org/10.1007/s13226-020-0402-z

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s13226-020-0402-z

Key words

2010 Mathematics Subject Classification

Navigation