Skip to main content

Interlinking of Indian Rivers: Floated Myths, Flouted Realities

  • Chapter
  • First Online:
Riverine Systems

Abstract

The gravity of concern about interlinking rivers (ILR) in India is huge and quite evidently has been associated with acrimonious debates. While various dispensations in the new millennium have generally been in favour of this mega-scale infrastructure project, no other infrastructure development project has perhaps received so much flak from the scientific community and the NGOs than the ILR project. Opposing discourses started flowing in ever since Suresh Prabhu took up the chairmanship of the task force of ILR in 2002—a position which he relinquished in 2006. The idea of interlinking is old enough to have invited the debate even in the last century. However, neither adequate scientific knowledge, nor appropriate technological know-how existed during that time to really take the debate to the public forum. The idea of linking rivers of India has its roots in the thoughts of Visveswarya, the stalwart engineer of yore. The idea was further extended by K.L. Rao, the legendary irrigation minister of India, and Captain Dastur, a pilot. Both Rao and Dastur envisaged the Ganga-Cauvery Link Canal and the Garland canals, respectively (Fig. 1). Rao felt that the solution to India’s water problems lie in transferring water from “water surplus” to “water deficit” basins. Even today, many believe that “robbing Peter to pay Paul” (RPBP) is a great idea to resolve the water problems.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 119.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 159.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Notes

  1. 1.

    The sub-basins comprising left-bank of the Ganga (bulk of which will be linked) like the Ghaghara, Gandak and Kosi with the sub-basins of the right bank tributaries and distributaries like the Yamuna, Son and Bhagirathi/Hooghli, have a much higher PUWC per capita than the average for the entire Ganga Basin and also much higher average annual volume of discharge than their right bank counterparts.

References

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Nilanjan Ghosh .

Editor information

Editors and Affiliations

ANNEXURE

ANNEXURE

Peninsular Component

Sl. No.

Name

States concerned

States benefited

Annual irrigation (Lakh ha)

Domestic and industrial supply (MCM)

Hydro-power (MW)

Status

1

Mahanadi (Manibhadra)- Godavari (Dowlaiswaram) link

Orissa, Maharashtra, Andhra Pradesh, Karnataka, & Chattisgarh,

Andhra Pradesh & Orissa

0.91+3.52 =4.43

802

445

Feasibility report completed

2

Godavari (Inchampalli)- Krishna (Pulichintala) link

Orissa, Maharashtra, Madhya Pradesh, Andhra Pradesh, Telangana, Karnataka &Chattisgarh,

Telangana & Andhra Pradesh

1.09+5.04 =6.13

413

--

Feasibility report completed

3

Godavari (Inchampalli)- Krishna (Nagarjunasagar) link

-do-

Telangana

2.87

237

975

Feasibility report completed

4

Godavari (Polavaram)- Krishna (Vijayawada) link

Orissa, Maharashtra, Andhra Pradesh, Karnataka, & Chattisgarh

Andhra Pradesh

5.82

162

--

Feasibility report completed

5

Krishna (Almatti)- Pennar link

-do-

Andhra Pradesh & Karnataka

1.90+0.68 =2.58

56

--

Feasibility report completed

6

Krishna (Srisailam)- Pennar link

Maharashtra, Andhra Pradesh, Karnataka & Telangana

--

--

--

17

Feasibility report completed

7

Krishna (Nagarjunasagar)- Pennar (Somasila) link

Maharashtra, Andhra Pradesh & Karnataka,

-do-

5.81

124

90

Feasibility report completed

8

Pennar (Somasila)- Cauvery (Grand Anicut) link

Andhra Pradesh, Karnataka, Tamil Nadu, Kerala & Puducherry

Andhra Pradesh, Tamil Nadu & Puducherry

0.49+4.36 +0.06 =4.91

1105

--

Feasibility report completed

9

Cauvery (Kattalai)- Vaigai - Gundar link

Karnataka, Tamil Nadu, Kerala & Puducherry

Tamil Nadu

3.38

185

--

Feasibility report completed

10

Ken-Betwa link a) Ken-Betwa Link Phase-I b) Ken-Betwa link Phase-II

Uttar Pradesh & Madhya Pradesh - do-

Uttar Pradesh & Madhya Pradesh Madhya Pradesh

2.66 + 3.69 =6.35 0.99

496

78

DPR Phase-I completed in April 2010 & DPR Phase-II completed in January 2014.

11

Parbati-Kalisindh- Chambal link

Madhya Pradesh, Rajasthan & Uttar Pradesh (UP requested to be consulted during consensus building )

Madhya Pradesh & Rajasthan

*Alt.I: 2.05+0.25 =2.30 (Alt.II : 1.77+0.43 =2.20)

13.2

--

Feasibility report completed

12

Par-Tapi-Narmada link

Maharashtra & Gujarat

Gujarat

2.32

76

22

DPR completed in August, 2015

13

Damanganga- Pinjal link (As per DPR )

Maharashtra & Gujarat

Maharashtra (only water supply to Mumbai)

--

895

--

DPR completed in March 2014

14

Bedti-Varda link

Maharashtra, Andhra Pradesh & Karnataka

Karnataka

0.60

--

4

Pre-feasibility report completed

15

Netravati- Hemavati link

Karnataka, Tamil Nadu & Kerala

Karnataka

0.34

--

--

Pre-feasibility report completed

16

Pamba- Achankovil-Vaippar link

Kerala & Tamil Nadu,

Tamil Nadu

0.91

--

508

Feasibility report completed

Himalayan Component

Sl. No.

Name of the Link

States/Country concerned

States benefited

Annual irrigation (Lakh ha)

Domestic and industrial supply (MCM)

Hydro- power (MW)

Status

1.

Manas-Sankosh-Tista-Ganga (M-S-T-G) link

Assam, West Bengal, Bihar & Bhutan

Assam, West Bengal & Bihar

2.08 + 1.82 + 2.64 = 6.54

--

5287

FR in progress

2.

Kosi-Ghaghra link

Bihar, Uttar Pradesh & Nepal

Bihar & Uttar Pradesh

8.17+ 0.67 + 1.74 (Nepal) = 10.58

48

--

FR in Indian portion in progress

3.

Gandak-Ganga link

-do-

Uttar Pradesh

37.99+2.41(Nepal) = 40.40

700

--

Draft FR completed (for Indian portion)

4.

Ghaghra-Yamuna link

-do-

Uttar Pradesh

25.30 + 1.35 (Nepal) =26.65

1391

10884

FR completed (for Indian portion)

5.

Sarda-Yamuna link

Bihar, Uttar Pradesh, Haryana, Rajasthan, Uttarakhand & Nepal

Uttar Pradesh & Uttarakhand

3.45 + 0.30 = 3.75

6250

3600

FR completed (for Indian portion)

6.

Yamuna-Rajasthan link

Uttar Pradesh, Gujarat, Haryana & Rajasthan

Haryana & Rajasthan

0.435 + 2.442 = 2.877

57

--

Draft FR completed

7.

Rajasthan-Sabarmati link

-do-

Rajasthan & Gujarat

5.35 + 2.04 = 7.39

282

--

Draft FR completed

8.

Chunar-Sone Barrage link

Bihar & Uttar Pradesh

Bihar & Uttar Pradesh

0.30 + 0.37 = 0.67

--

--

Draft FR completed

9.

Sone Dam-Southern Tributaries of Ganga link

Bihar & Jharkhand

Bihar & Jharkhand

2.99 + 0.08 = 3.07

360

95

FR in progress

10.

Ganga(Farakka)-Damodar- Subernarekha link

West Bengal, Orissa & Jharkhand

West Bengal, Orissa & Jharkhand

7.63 + 0.30 + 0.55 = 8.47

484

-

Draft FR completed

11.

Subernarekha-Mahanadi link

West Bengal & Orissa

West Bengal & Orissa

0.18 + 0.365 = 0.545

--

9

Draft FR completed

12.

Kosi-Mechi link

Bihar, West Bengal & Nepal

Bihar

2.99 + 1.75 (Nepal) = 4.74

24

3180

PFR completed. FR to be taken up Entirely lies in Nepal

13.

Farakka-Sunderbans link

West Bengal

West Bengal

1.50

184

--

Draft FR completed

14.

Jogighopa-Tista-Farakka link (Alternative to M-S-T-G)

-do-

Assam, West Bengal & Bihar

----

216

1115

Alternative to M-S-T-G Link. Not to be taken up.

Rights and permissions

Reprints and permissions

Copyright information

© 2022 Capital Publishing Company, New Delhi, India

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Ghosh, N., Modak, S. (2022). Interlinking of Indian Rivers: Floated Myths, Flouted Realities. In: Mukherjee, A. (eds) Riverine Systems. Springer, Cham. https://doi.org/10.1007/978-3-030-87067-6_15

Download citation

Publish with us

Policies and ethics