Safety risk assessment in shopping center construction projects using Fuzzy Fault Tree Analysis method

  • Published:
Quality & Quantity Aims and scope Submit manuscript

Abstract

Safety risk management is one of the important techniques to be performed in large construction projects. The purpose of risk management is to identify the origin of the risks, uncertainties, and effects then offer suitable management responses to these risks. In this research, first, the possible accident in construction projects was identified by studying various sources and statistics in Iran. Brainstorm was used to specify the determinant factors in these accidents. Fault tree analysis and fuzzy logic were employed to evaluate these accidents and calculate their probability of occurrence. Next, the significance of each determinant factor in the accident was identified using the improvement index in fault tree analysis. Finally, the determinant factors in the accident were prioritized in terms of significance to provide a proper solution. The mentioned steps were carried out in two commercial building projects located south of Tehran, Iran. The most important safety risks were determined to be the fall of materials from the height with a probability of 92% in project A, and the fall of workers from the height with a probability of 52% in construction project B. Also, the second important risk in both projects was the fall of objects with a probability of 91% of construction project A and 51% for project B. The most important determinant factors were the insufficient skill of the workers in project A (with an improving safety index of 14.4%) and insufficient light and visibility in project B (with an improving safety index of 9%). The use of the Likert scale in the questionnaire instead of the Thurston scale and applying improvement index of fault tree in prioritization may be new compared to other studies.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7

Similar content being viewed by others

Notes

  1. Analytic Hierarchy Process.

References

  • Abbas, M., Mneymneh, B.E., Khoury, H.: Assessing on-site construction personnel hazard perception in a Middle Eastern developing country: An interactive graphical approach. Saf. Sci. 103, 183–196 (2018)

    Article  Google Scholar 

  • Al-Samarraie, H., Hurmuzan, S.: A review of brainstorming techniques in higher education. Think Skills Creat. 27, 78–91 (2018)

    Article  Google Scholar 

  • Amini B. (2009) Review and analysis of events in the construction industry and the general in Iran in 2008.2th construction safety conference. khaneh Omran. Iran. Tehran. [In Persian]

  • Amiri, M., A. Ardeshir, Zarandi, M. H. F.: Risk-based analysis of construction accidents in Iran during 2007–2011-meta analyze study. Iran. J. Public Health 43 (4), 507 (2014)

    Google Scholar 

  • Amiri, M., Ardeshir, A., Zarandi, M.H.F.: Fuzzy probabilistic expert system for occupational hazard assessment in construction. Saf. Sci. 93, 16–28 (2017)

    Article  Google Scholar 

  • Ardeshir, A., Amiri, M., Mohajeri, M.: Safety risk assessment in mass housing projects using a combination of fuzzy FMEA, fuzzy FTA, and AHP-DEA. Iran Occup. Health 10(6), 78–91 (2013)

    Google Scholar 

  • Ardeshir, A., Amiri, M., Ghasemi, Y., Errington, M.: Risk assessment of construction projects for water conveyance tunnels using fuzzy fault tree analysis International. J Civil Eng 12(4), 396–412 (2014a)

    Google Scholar 

  • Ardeshir, A., Maknoon, R.R., Eslami, M., Jahantab, Z.: Assessing the safety risks affecting the health of individuals in high-rise projects with a fuzzy approach. Iran Occup. Health 11(3), 82–95 (2014b)

    Google Scholar 

  • Ayav, T., Sözer, H.: Identifying critical architectural components with spectral analysis of fault trees. Appl. Soft Comput. 49, 1270–1282 (2016)

    Article  Google Scholar 

  • Bekbaki, A., Nabhani, N., Anvaripour, B., Shieelahi, G.A. (2017) Possible Risk Assessment by fuzzy fault tree Method Based on Two Distributions Possibility of Defect in Process function. Journal of Occupational Health Engineering, 4(2): 41-52 (Frasi)

  • Chen, S.J., Hwang, C.L.: Fuzzy multiple attribute decision making methods. In: Fuzzy multiple attribute decision making, pp. 289–486. Springer, Berlin, Heidelberg (1992)

    Chapter  Google Scholar 

  • Cochran, W.G.: Sampling techniques, 3rd edn. John Wiley & Sons, New York (1977)

    Google Scholar 

  • Darhami, V., Basoli, M.: Fault Tree Analysis Using Fuzzy Logic, 2nd National Conference on Industrial Engineering, Yazd University, Yazd, Iran (2002)

  • Debnath, J., Biswas, A., Sivan, P., Sen, K.N., Sahu, S.: Fuzzy inference model for assessing occupational risks in construction sites. Int. J. Ind. Ergon. 55, 114–128 (2016)

    Article  Google Scholar 

  • Gharib, M. (2011) Designing an integrated approach to HSE for conventional building construction in Iran, MS thesis, Amirkabir University, Tehran (in Farsi).

  • Hughes, P., Ferrett, E.: introduction to Health and Safety at Work: for the NEBOSH National General Certificate in Occupational Health and Safety. Routledge Taylor and Francis groups, UK (2011)

    Book  Google Scholar 

  • Hung, Y-H., Woodrow, W., WinchesterIII Tonya, L., Smith-Jackson Brian, M., KleinerKari, L., Babski-ReevesThomas H.Mills (2013) Identifying fall-protection training needs for residential roofing subcontractors, Applied ergonomics, 44(3): 372-380.

  • Ilbahar, E., Karaşan, A., Cebi, S., Kahraman, C.: A novel approach to risk assessment for occupational health and safety using Pythagorean fuzzy AHP & fuzzy inference system. Saf. Sci. 103, 124–136 (2018)

    Article  Google Scholar 

  • Isfahani, H.: Fault tree analysis. Barter College publisher, Iran (2009). ((in Farsi))

    Google Scholar 

  • Jamali, T.M., Bezaati, S.: Identification, assessment, and prioritization of HSE risks in the construction projects, Case study of Khorasan Razavi province Regional Water authority, the first research conference in Civil Engineering. Architecture and Earth Sciences, Tehran September (2017)

    Google Scholar 

  • Kabir, S., Papadopoulos, Y.: A review of applications of fuzzy sets to safety and reliabilityengineering. Int. J. Approx. Reason. 100, 29–55 (2018)

    Article  Google Scholar 

  • Kaufman, A., Gupta, M.M.: Introduction to fuzzy arithmetic. Van Nostrand Reinhold Company, New York, USA (1991)

    Google Scholar 

  • Khalifa, S.S., Saadan, K., Norwawi, N.M.: Risk assessment of mined areas using fuzzy inference. Int. J. Artif. Intell. Appl. 6(2), 37–48 (2015)

    Google Scholar 

  • Likert, R. (1932). A technique for the measurement of attitudes. Archives of psychology

  • Liu, H.T., Tsai, Y.L.: A fuzzy risk assessment approach for occupational hazards in the construction industry. Saf. Sci. 50(4), 1067–1078 (2012)

    Article  Google Scholar 

  • Mir Lavasani, M.R., Wang, J., Yang, Z., Finlat, J.: Application of fuzzy fault tree analysis on oil and gas offshore pipelines. Int. J. Marine Sci. Eng. 1(1), 29–42 (2011)

    Google Scholar 

  • Krishna, B., Misra, K.B., Weber, G.G.: A new method for fuzzy fault tree analysis. Microelectr. Rehab 29(2), 195–216 (1989)

    Article  Google Scholar 

  • Mohajeri, M., Amiri, M.: Ranking of main causes of falling from height hazard in high-rise construction projects. Iran Occup. Health 11(5), 53–64 (2014)

    Google Scholar 

  • Mohajeri, M., Ardeshir, A.: Analysis of construction safety risks using the AHP-DEA integrated method. Amirkabir J. Civil Eng. 48(3), 217–226 (2016)

    Google Scholar 

  • Dormohammadi, A., Mohammadfam, I., Zarei, E.: Presenting HSE contractors a practical model for evaluating the construction performance. J. Occup. Health 13(6), 10–22 (2016). ((Frasi))

    Google Scholar 

  • Occupational Safety and Health Research and Training Center: Risk Identification and Risk Assessment Training Booklet for Workshop Safety Officers, Tehran: Ministry of Cooperatives. Labor and Social Welfare, Deputy Minister of Labor Relations, Iran(Farsi) (2017)

    Google Scholar 

  • Omidvari, M., Lavasani, S.M.R., Mirza, S.: Presenting of failure probability assessment pattern by FTA in Fuzzy logic (case study: Distillation tower unit of oil refinery process). J. Chem. Health Saf. 21(6), 14–22 (2014)

    Article  Google Scholar 

  • Pinto, A.: QRAM a qualitative occupational safety risk assessment model for the construction industry that incorporates uncertainties with the use of fuzzy sets. Saf. Sci. 63, 57–76 (2014)

    Article  Google Scholar 

  • Purba, J. H.: Fuzzy probability on reliability study of nuclear power plant probabilistic safety assessment: A review. Prog. Nucl. Energy 76, 73–80 (2014)

    Article  Google Scholar 

  • Purba, J H., Tjahyani, D T S and Deswandri (2019) The implementation of fault tree analysis approach in nuclear power plant probabilistic safety assessment Cite as AIP Conference Proceedings 2180: 020010https://doi.org/10.1063/1.5135519

  • Rekab Eslamizadeh, M. (2013), Risk Assessment in High-Level Projects with Fuzzy Approach, Master Thesis, Amirkabir University of Technology, Tehran

  • Renjith, V.R., Madhu, G., Nayagam, V.L.G., Bhasi, A.B.: Two-dimensional fuzzy fault tree analysis for chlorine release from a Chlor-alkali industry using expert elicitation. J. Hazard. Mater. 183(1–3), 103–110 (2010)

    Article  Google Scholar 

  • Rezakhani, P.: Fuzzy risk analysis model for construction projects. Int. J. Civil Struct. Eng. 2(2), 507–522 (2011)

    Google Scholar 

  • Ross, T.J.: Fuzzy logic with engineering applications. Wiley, New Jersy (2005)

    Google Scholar 

  • Salimi, M.S., Moradi, S.B., Soofi, J.: Design and building of a scale of total Likert scores with a research approach in management. J. Manage Knowl. 80(21), 41–60 (2008). ((Farsi))

    Google Scholar 

  • Statistics and Strategic Information Center: Accidents at Work in the Mirror of Statistics. Publication of Strategic Statistics and Information Center in Iran, Tehran (2014).. ((Frasi))

    Google Scholar 

  • Tam, C.M., Zeng, S. X., Deng, Z. M.: Identifying elements of poor construction safety management in China. Saf. Sci. 42(7), 569–586 (2004)

    Article  Google Scholar 

  • Thurstone, L.L.: Attitudes can be measured. Am. J. Sociol. 33(4), 529–554 (1928)

    Article  Google Scholar 

  • Vakilazad, G., Pour sotoudeh, N.: Environmental risk assessment methods in oil and gas transmission line projects. J. Oil Gas Energy 42, 12–20 (2017)

    Google Scholar 

  • Zadeh L. A. (1965) Fuzzy sets Information and Control,8(3): 335-353

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to G. Asadollahfardi.

Ethics declarations

Conflict of interest

We do not have any conflict of interest with any organization and people.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Aghaei, P., Asadollahfardi, G. & Katabi, A. Safety risk assessment in shopping center construction projects using Fuzzy Fault Tree Analysis method. Qual Quant 56, 43–59 (2022). https://doi.org/10.1007/s11135-021-01115-9

Download citation

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11135-021-01115-9

Keywords

Navigation