Abstract
In this study, we deal with the problem of short-term transportation outsourcing for transshipment centers. The carrier needs to determine the numbers of outsourced and self-run trips for the different types of transportation tasks. Stochastic demands which are likely to occur in actual operation are considered. Different trip numbers need to be determined in sequence, so a two-stage stochastic programming technique is applied to formulate the problem. Two models are developed based upon practical considerations to help determine the optimal transportation outsourcing plan. A case study regarding the operations of a logistics carrier in Taiwan is performed. Several tests are also performed considering the number of demand scenarios, optimality gaps, variations in demands, outsourcing cost variations, and problem dimensions in order to better understand the performance of the two models.
Similar content being viewed by others
References
Audy JF, D’Amours S, Rousseau LM (2011) Cost allocation in the establishment of a collaborative transportation agreement—an application in the furniture industry. J Oper Res Soc 62:960–970
Birge JR (1982) The value of the stochastic solution in stochastic linear programs with fixed recourse. Math Program 24(1):314–325
Crainic TG, Maggioni F, Perboli G, Rei W (2017) Reduced cost-based variable fixing in two-stage stochastic programming. Technical report, CIRRELT 2017-10, Interuniversity Research Centre on Enterprise Networks, Logistics and Transportation, Canada
Dai B, Chen H (2012) Profit allocation mechanisms for carrier collaboration in pickup and delivery service. Comput Ind Eng 62:633–643
Dai B, Chen H (2015) Proportional egalitarian core solution for profit allocation games with an application to collaborative transportation planning. Eur J Ind Eng 9:53–76
Flisberg P, Frisk M, Rönnqvist M, Guajardo M (2015) Potential savings and cost allocations for forest fuel transportation in Sweden: a country-wide study. Energy 85:353–365
Frisk M, Göthe-Lundgren M, Jörnsten K, Rönnqvist M (2010) Cost allocation in collaborative forest transportation. Eur J Oper Res 205:448–458
Hsiao HI, Kemp RGM, van der Vorst JGAJ, Omta SWFO (2010) A classification of logistic outsourcing levels and their impact on service performance: Evidence from the food processing industry. Int J Prod Econ 124:75–86
Hernandez S, Peeta S, Kalafatas G (2011) A less-than-truckload carrier collaboration planning problem under dynamic capacities. Transp Res Part E 47:933–946
Kahraman C, Beskese A, Kaya I (2010) Selection among ERP outsourcing alternatives using a fuzzy multi-criteria decision making methodology. Int J Prod Res 48:547–566
Kaut M, Wallace SW (2007) Evaluation of scenario-generation methods for stochastic programming. Pac J Optim 3:257–271
Li Y, Wang X, Adams TM (2009) Ride service outsourcing for profit maximization. Transp Res Part E 45:138–148
Maggioni F, Allevi E, Bertocchi M (2014) Bounds in multistage linear stochastic programming. J Optim Theory Appl 163(1):200–229
Maggioni F, Allevi E, Bertocchi M (2016) Monotonic bounds in multistage mixed-integer stochastic programming. Comput Manag Sci 13(3):423–457
Maggioni F, Kaut M, Bertazzi L (2009) Stochastic optimization models for a single-sink transportation problem. Comput Manag Sci 6(2):251–267
Maggioni F, Pflug G (2016) Bounds and approximations for multistage stochastic programs. SIAM J Optim 26(1):831–855
Maggioni F, Wallace S (2012) Analyzing the quality of the expected value solution in stochastic programming. Ann Oper Res 200:37–54
van Damme DA, van Amstel MJP (1996) Outsourcing logistics management activities. Int J Logist Manag 7:85–94
Wang Y, Ma X, Xu M, Wang L, Wang Y, Liu Y (2015) A methodology to exploit profit allocation in logistics joint distribution network optimization. Math Prob Eng 2015: Article ID 827021, 15 pages
Yuzhong M, Guangming Y (2012) A study of outsourcing and self-run business decision-making in the distribution transportation of international logistics. Energy Procedia 16:965–970
Yilmaz O, Savasaneril S (2012) Collaboration among small shippers in a transportation market. Eur J Oper Res 218:408–415
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Tang, CH. Two-stage stochastic modeling of transportation outsourcing plans for transshipment centers. 4OR-Q J Oper Res 16, 67–94 (2018). https://doi.org/10.1007/s10288-017-0355-1
Received:
Revised:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10288-017-0355-1
Keywords
- Transportation outsourcing
- Transshipment center
- Stochastic demands
- Two-stage stochastic model
- Short-term operations