Skip to main content

Regional Markets

  • Chapter
  • First Online:
Regulation of the Power Sector

Part of the book series: Power Systems ((POWSYS))

Abstract

The last two decades have seen a general trend towards the creation of supra-national or regional electricity markets, i.e. markets comprising several countries or states. Examples include the European Union’s Internal Electricity Market (IEM); the market developing in South-East Europe that will join the IEM sooner or later; the NORDEL market in Scandinavia, MIBEL in the Iberian peninsula and the Single Electricity Market (SEM) in the island of Ireland; The Central American Electricity Market (Mercado Regional de Electricidad, MER), MERCOSUR and the Andean markets in South America, which will eventually merge as well; the US’s standard market design (SMD) as an attempt to establish a common template for electricity markets across the country; the Australian National Electricity Market (NEM) or the market in the Mekong Delta region.

As in most industries, the power sector has been witness to a relentless drive to convert local into regional markets. No one can deny the need for these markets, in light of the huge challenges that lay ahead on the road to a sustainable society where scarce resources are allocated, both fairly and efficiently, at a global level.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 259.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 329.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 329.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Notes

  1. 1.

    Because of the need to maintain an instantaneous balance of supply and demand in a power system, as explained in Chap. 1 of this book, provision must consequently be made for operating reserves (i.e. generation whose output is able to adapt within seconds to changing system conditions). The installation of very large amounts of intermittent renewable generation (mainly wind, but also solar) is intensifying system variability, and with it the need for system reserves. Ensuring that such reserves are available at each local system calls for building many more permanently operating units than strictly necessary. With the integration of national or local electric systems, reserves could be shared under a scheme whereby each system could draw from the reserves in others whenever needed (automatically, in the case of primary reserves).

  2. 2.

    An alternative scheme would have a single committee for the approval of any regional line.

  3. 3.

    The complete rules of the Central American Regional Market can be found at http://www.crie.org.gt/files/rmer.pdf, in the website of the Regional Electricity Regulatory Commission, CRIE.

  4. 4.

    IEM at the EC: http://ec.europa.eu/energy/gas_electricity/index_en.htm, ACER: http://www.acer.europa.eu/Electricity/Pages/default.aspx, ENTSO-E: https://www.entsoe.eu/resources/network-codes/.

  5. 5.

    The most current legislation comprises Directive (2009/72/EC) of July 2009, Regulation (EC) No 714/2009 of July 2009 on conditions for access to the network for cross-border exchanges in electricity, Regulation (EU) No 1227/2011 on wholesale energy market integrity and transparency (REMIT). There is also a Directive (2005/89/EC) of January 2006 concerning measures to safeguard security of electricity supply and infrastructure investment.

  6. 6.

    Exceptions exist, as the mandatory target for penetration of renewables in energy consumption: 20 % by 2020, or the cap-and-trade scheme to reduce CO2 emissions by at least 20 % on 2020 with respect to 1990 emissions; both measures have strong implications on the composition of the electricity generation mix.

  7. 7.

    https://www.entsoe.eu/system-development/tyndp/ [12].

  8. 8.

    Note that principle (a) could be understood, particularly for countries at the European periphery, as just an extension of a multiplicity of individual national capacity instruments beyond their respective MSs borders, and therefore not the same thing as the—conceptually, at least—more efficient single EU-wide capacity mechanism.

References

  1. ERGEG (2005) The creation of regional electricity markets. http://www.ergeg.org/portal/page/portal/ERGEG_HOME/ERGEG_DOCS/ERGEG_DOCUMENTS_NEW/ELECTRICITY_FOCUS_GROUP/ p 123

  2. MIT (2011) Transmission Expansion, in MIT Study on the ‘Future of the Electric Grid’. pp 268. http://web.mit.edu/mitei/research/studies/documents/electric-grid-2011/Electric_Grid_Full_Report.pdf

  3. Olmos L (2006) Regulatory design of the transmission activity in regional electricity markets. PhD Thesis in Instituto de Investigación Tecnológica, Pontificia Comillas University, Madrid

    Google Scholar 

  4. Pérez-Arriaga IJ, Gómez T, Olmos L, Rivier M (2011) Transmission and distribution networks for a sustainable electricity supply. In: Galarraga Ibon, González-Eguino Mikel, Markandya Anil (eds) ‘Handbook Of Sustainable Energy’ Edward Edgar Publishing. United Kingdom, Cheltenham

    Google Scholar 

  5. Sioshansi FP (2006) Electricity market reform. An international perspective, Elsevier

    Google Scholar 

References on the Functioning of Specific Regional (and National) Markets

  1. Agency for the Cooperation of Energy Regulators (2011a) Framework guidelines on electricity grid connections. Agency for the Cooperation of Energy Regulators. pp 14. http://acernet.acer.europa.eu/portal/page/portal/ACER_HOME/Communication/News/110720_FGC_2011E001_FG_Elec_GrConn_FINAL.pdf Accessed 20 July 2011

  2. Agency for the Cooperation of Energy Regulators (2011b) Framework guidelines on capacity allocation and congestion management for electricity. Agency for the cooperation of energy regulators. pp 15. http://acernet.acer.europa.eu/portal/page/portal/ACER_HOME/Communication/News/FG-2011-E-002%20(Final).pdf. Accessed 20 July 2011

  3. Agency for the Cooperation of Energy Regulators (2011c) Framework guidelines on electricity system operation. Agency for the cooperation of energy regulators. pp 28. http://www.acer.europa.eu/Official_documents/Acts_of_the_Agency/Framework_Guidelines/FG%20on%20Electricity%20System%20Operation/FG-2011-E-003_02122011_Electricity%20System%20Operation.pdf. Accessed 2 Dec 2011

  4. Belpex (2010) Market Coupling. http://www.belpex.be/index.php?id=4

  5. De Dios R, Sanz S, Alonso JF, Soto F (2009). Long-term grid expansion: Spanish Plan 2030. In: CIGRE conference 2009. http://www.cigre.org

  6. EOR (2005) Reglamento del Mercado Eléctrico Regional (RMER). Libro III del RMER de la Transmisión, Ente Operador Regional (EOR)

    Google Scholar 

  7. ENTSO-E (2010) Ten year network development plan, TYNDP. https://www.entsoe.eu/index.php?id=282

  8. EP (2003) Directive 2003/54/EC of the European Parliament and of the Council concerning common rules for the internal market in electricity and repealing Directive 96/92/EC

    Google Scholar 

  9. EP (2003a) Regulation (EC) No 1228/2003 of the European Parliament and of the council of 26 June 2003 on conditions for access to the network for cross-borderexchanges in electricity. http://europa.eu.int/eurlex/pri/en/oj/dat/2003/l_176/l_17620030715en000100 10.pdf:10

  10. EP (2009) Directive 2009/72/EC concerning common rules for the internal market in electricity and repealing Directive 2003/54/EC

    Google Scholar 

  11. ETSO (2009) Development and implementation of a coordinated model for regional and inter-regional congestion management, a report by the association of European Transmission System Operators. http://www.entsoe.eu/fileadmin/user_upload/_library/publications/ etso/Congestion_Management/ETSO-EuroPEX%20report-25-02-09.pdf

  12. ETSO (2001a) Co-ordinated Auctioning: A market-based method for transmission capacity allocation in meshed networks, a report by the Association of European Transmission System Operators (ETSO). http://www.etsonet.org/ upload/documents/Coordinated%20Auctioning.pdf: 22

  13. ETSO (2001b) Key concepts and definitions for transmission access products, a report by the association of European Transmission System Operators, http://www.entsoe.eu/fileadmin/user_upload/_library/publications/etso/Congestion_Management/Key%20Concepts%20for%20Transmission%20Access%20Products.pdf

  14. Federal Energy Regulatory Commission (2011) Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities, Order No. 1000. http://www.ferc.gov/industries/electric/indus-act/trans-plan/fr-notice.pdf. Accessed 21 July 2011

  15. KEMA Consulting, ISA (2004) Informe de diseño de detalle del Mercado Eléctrico Regional. Versión Final pp 124. http://www.enteoperador.org/ (in Spanish)

  16. PHB-HAGLER/SYNEX (2000) Diseño General del Mercado Eléctrico Regional. A report by Mercados Energéticos S.A., PHB-HAGLER BAILLY and SYNEX Ingenieros Consultores for the Unidad Ejecutora del Proyecto SIEPAC

    Google Scholar 

References for In-depth Regulatory Study of Specific Topics

  1. Chao H-P, Peck S (2000) Flow-based transmission rights and congestion management. Electr J 13(8):38–59

    Article  Google Scholar 

  2. Gilbert R, Neuhoff K, Newbery D (2004) Allocating transmission to mitigate market power in electricity markets. RAND J Econ, RAND Corp 35(4):691–709

    Article  Google Scholar 

  3. Hogan WW (1992) Contract networks for electric power transmission. J Regul Econ 4(3):211–242

    Article  Google Scholar 

  4. Hogan WW (2002) Financial transmission right formulations. Working document. http://www.ksg.harvard.edu/hepg. Center for Business and Government, John F. Kennedy School of Government, Harvard University, Cambridge

  5. Olmos L, Pérez-Arriaga IJ (2007) Evaluation of three methods proposed for the computation of inter-TSO payments in the Internal Electricity Market of the European Union. IEEE Trans Power Syst 22(4):1507–1522

    Article  Google Scholar 

  6. Pérez-Arriaga IJ, Rubio-Odériz F, Puerta Gutiérrez JF, Arcéluz Ogando J, Marín J (1995) Marginal pricing of transmission services: an analysis of cost recovery. IEEE Trans Power Syst 10(1):65–72

    Google Scholar 

  7. Pérez-Arriaga IJ, Olmos L (2005) A plausible congestion management scheme for the internal electricity market of the European Union. Util Policy 13(2):117–134

    Google Scholar 

  8. Pérez-Arriaga IJ, Olmos L (2007a) Compatibility of investments in generation, transmission and distribution. In: François L (ed) Competitive electricity markets and sustainability. Edward Elgar pp 230–288

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Luis Olmos .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer-Verlag London

About this chapter

Cite this chapter

Olmos, L., Pérez-Arriaga, I.J. (2013). Regional Markets. In: Pérez-Arriaga, I. (eds) Regulation of the Power Sector. Power Systems. Springer, London. https://doi.org/10.1007/978-1-4471-5034-3_10

Download citation

  • DOI: https://doi.org/10.1007/978-1-4471-5034-3_10

  • Published:

  • Publisher Name: Springer, London

  • Print ISBN: 978-1-4471-5033-6

  • Online ISBN: 978-1-4471-5034-3

  • eBook Packages: EnergyEnergy (R0)

Publish with us

Policies and ethics