Abstract
GEOMORPHIC SETTING: Toboggan Hill is artificial mound (hill) consisting of industrial waste covered with a clay cap and top soil layer (Fig. 1). Toboggan runs were constructed on one side of the hill. The facility was incorporated into a county park running along Edward Hines Drive and paralleling the Rouge River.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
ADDITIONAL READING:
Gray, D.H. (2001). Combined Use/Installation of Rolled Erosion Control Products with Soil Bioengineering Measures. Proceedings, 15th GSI/GRI Conference, Houston, TX
Gray, D.H. and Koerner, R.M. (2002). Post Closure Beneficial Uses of Landfills. Proceedings, 16th GSI/GRI Conference, Philadelphia, PA
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer Science+Business Media New York
About this chapter
Cite this chapter
Goldsmith, W., Gray, D., McCullah, J. (2014). Project #8: Toboggan Hill. In: Bioengineering Case Studies. Springer, New York, NY. https://doi.org/10.1007/978-1-4614-7996-3_9
Download citation
DOI: https://doi.org/10.1007/978-1-4614-7996-3_9
Published:
Publisher Name: Springer, New York, NY
Print ISBN: 978-1-4614-7995-6
Online ISBN: 978-1-4614-7996-3
eBook Packages: EngineeringEngineering (R0)