Abstract
Changes to construction contracts are a part of contract construction. Disputes frequently result from changes in the scope of the work, changed conditions, or the effect of changes on the work. Change related disputes can, however, be minimized through efficient administrative procedures.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 1986 Van Nostrand Reinhold Company Inc.
About this chapter
Cite this chapter
Mueller, F.W. (1986). Contract Administration. In: Integrated Cost and Schedule Control for Construction Projects. Springer, Boston, MA. https://doi.org/10.1007/978-1-4615-9750-6_18
Download citation
DOI: https://doi.org/10.1007/978-1-4615-9750-6_18
Publisher Name: Springer, Boston, MA
Print ISBN: 978-1-4615-9752-0
Online ISBN: 978-1-4615-9750-6
eBook Packages: Springer Book Archive