A Resource Flow Based Multistage Dynamic Scheduling Method for the State-Dependent Work

  • Conference paper
  • First Online:
Simulation and Modeling Methodologies, Technologies and Applications (SIMULTECH 2017)

Abstract

We study a dynamic scheduling method for the state-dependent work based on the resource flow within a process of the work. Namely, we develop a multistage dynamic scheduling model consisting of N classes of activities and a three-layer control structure. Then, we devise a resource flow based order selection method and resource allocation method to provide successful results from the works under the limited resources. To demonstrate the effectiveness of our method via numerical examples, we apply the developed method to the project cost estimation process of the EPC (Engineering-Procurement-Construction) contractor for the purpose of determining acceptance of profitable projects in competitive bidding situations.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Pinedo, M.L.: Scheduling: Theory, Algorithms, and Systems, 4th edn. Springer, New York (2014)

    Google Scholar 

  2. Jacobs, F.R., Berry, W.L., Whybark, C.D., Vollmann, T.E.: Manufacturing Planning and Control for Supply Chain Management. McGraw-Hill, New York (2011)

    Google Scholar 

  3. Ishii, N., Takano, Y., Muraki, M.: A simulation-based dynamic scheduling method in project cost estimation process. In: Mohammad, S., Obaidat, M.S., Ören, T., Merkuryev, Y. (eds.) Simulation and Modeling Methodologies, Technologies and Applications, Advances in Intelligent Systems and Computing book series, vol. 676, pp. 261–279. Springer, Heidelberg (2017)

    Google Scholar 

  4. Ishii, N., Takano, Y., Muraki, M.: A dynamic scheduling problem for estimating project cost. In: Proceedings of Scheduling Symposium 2015, Tokyo, pp. 119–124 (2015)

    Google Scholar 

  5. Ishii, N., Takano, Y., Muraki, M.: A dynamic scheduling problem in cost estimation process of EPC projects. In: Proceedings of the 6th International Conference on Simulation and Modeling Methodologies, Technologies and Applications, pp. 187–194 (2016)

    Google Scholar 

  6. Pritchard, N., Scriven, J.: EPC Contracts and Major Projects, 2nd edn. Sweet & Maxwell, London (2011)

    Google Scholar 

  7. Ishii, N., Takano, Y., Muraki, M.: An order acceptance strategy under limited engineering man-hours for cost estimation in engineering-procurement-construction projects. Int. J. Project Manage. 32(3), 519–528 (2014)

    Article  Google Scholar 

  8. Ishii, N., Takano, Y., Muraki, M.: Resource flow based order selection method in project cost estimation process. In: Proceedings of the 7th International Conference on Simulation and Modeling Methodologies, Technologies and Applications, pp. 155–162 (2017)

    Google Scholar 

  9. Rothkopf, M.H., Harstad, R.M.: Modeling competitive bidding: A critical essay. Manage. Sci. 40, 364–384 (1994)

    Article  Google Scholar 

  10. Shafahi, A., Haghani, A.: Modeling contractors’ project selection and markup decisions influenced by eminence. Int. J. Project Manage. 32(8), 1481–1493 (2014)

    Article  Google Scholar 

  11. Kortanek, K.O., Sodeni, J.V., Sodaro, D.: Profit analyses and sequential bid pricing models. Manage. Sci. 20, 396–417 (1973)

    Article  MathSciNet  Google Scholar 

  12. Ishii, N., Takano, Y., Muraki, M.: A heuristic bidding price decision algorithm based on cost estimation accuracy under limited engineering man-hours in EPC projects. In: Obaidat, M., Koziel, S., Kacprzyk, J., Leifsson, L., Ören, T. (eds.) Simulation and Modeling Methodologies, Technologies and Applications, Advances in Intelligent Systems and Computing, vol. 319, pp. 101–118. Springer, Heidelberg (2015)

    Google Scholar 

  13. Ishii, N., Takano, Y., Muraki, M.: A revised algorithm for competitive bidding price decision under limited engineering man-hours in EPC projects. Oukan (J. Transdiscipl. Fed. Sci. Technol.) 10(1), 47–56 (2016)

    Google Scholar 

  14. Takano, Y., Ishii, N., Muraki, M.: A sequential competitive bidding strategy considering inaccurate cost estimates. OMEGA 42(1), 132–140 (2014)

    Article  Google Scholar 

  15. Takano, Y., Ishii, N., Muraki, M.: Multi-period resource allocation for estimating project costs in competitive bidding. CEJOR 25(2), 303–323 (2017)

    Article  MathSciNet  Google Scholar 

  16. AACE International: Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the Process Industries. AACE International Recommended Practice No. 18R-97 (2011)

    Google Scholar 

  17. Turton, R., Bailie, R.C., Whiting, W.B., Shaeiwitz, J.A., Bhattacharyya, D.B.: Analysis, Synthesis and Design of Chemical Processes, 4th edn. Pearson, New Jersey (2012)

    Google Scholar 

  18. Kerzner, H.: Project Management: A Systems Approach to Planning, Scheduling, and Controlling. Wiley, New Jersey (2013)

    Google Scholar 

  19. Pritsker, A.A.B., O’Reilly, J.J.: AWESIM: the integrated simulation system. In: Proceedings of the 1998 Winter Simulation Conference, pp. 249–255 (1998)

    Google Scholar 

  20. Zhou, L., Zhang, L., Sarker, B.R., Laili, Y., Ren, L.: An event-triggered dynamic scheduling method for randomly arriving tasks in cloud manufacturing. Int. J. Comput. Integr. Manuf. 31(3), 318–333 (2018)

    Article  Google Scholar 

Download references

Acknowledgements

This work was supported by JSPS KAKENHI Grant Number 16K01252

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Nobuaki Ishii .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Ishii, N., Takano, Y., Muraki, M. (2019). A Resource Flow Based Multistage Dynamic Scheduling Method for the State-Dependent Work. In: Obaidat, M., Ören, T., Rango, F. (eds) Simulation and Modeling Methodologies, Technologies and Applications . SIMULTECH 2017. Advances in Intelligent Systems and Computing, vol 873. Springer, Cham. https://doi.org/10.1007/978-3-030-01470-4_16

Download citation

Publish with us

Policies and ethics