Skip to main content

Resource Analysis

  • Chapter
  • First Online:
Integrated Project Management Sourcebook
  • 2465 Accesses

Abstract

In the PERT/CPM scheduling techniques (see articles 5.1.6 on page 59 and 5.1.2 on page 46), project activities are characterized by their estimated duration(s) and project networks are constructed by adding precedence relations between these activities. It is therefore implicitly assumed that these activities do not require resources during their execution (or alternatively, the assumption is that the resources are unlimited in availability). In practice, activities need resources during their execution that are often limited in availability. These resources have been classified in two basic categories, as follows:

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 249.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2016 Springer International Publishing Switzerland

About this chapter

Cite this chapter

Vanhoucke, M. (2016). Resource Analysis. In: Integrated Project Management Sourcebook. Springer, Cham. https://doi.org/10.1007/978-3-319-27373-0_4

Download citation

Publish with us

Policies and ethics