Skip to main content

A GA Based Approach for Solving Multi Criteria Project Scheduling Problems

  • Conference paper
  • First Online:
Operations Research Proceedings 2008

Summary

In this paper we present a Genetic Algorithm (GA) for generating eficient solutions for multi criteria resource constrained project scheduling problems where conicting regular as well as non regular performance measures have to be respected (cf. [4]). The GA-scheme is similar to the one developed by [1], i.e. the genes of the genotype do not only represent activities of the phenotype but also information on the decoding scheme and modus. Since a large number of (mostly similar) solutions is usually not of great help for a planner not all efficient solutions are maintained in order to reduce complexity. Thus, we use a “relaxed Pareto operator" which does accept efficient solutions only which differ (substantially) with respect to solution quality (and structure). We have applied this procedure to solve the Movie Shoot Scheduling Problem (MSSP) and we report first results.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Alcaraz, J.; Maroto, C. (2006): A Hybrid Genetic Algorithm Based on Intelligent Encoding for Project Scheduling. In: Józefowska, J.; Weglarz, J. (Eds.): Perspectives in Modern Project Scheduling. Springer US, 2006, p. 249–274.

    Google Scholar 

  2. Bomsdorf, F.; Derigs, U. (2007): A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem. In: OR Spectrum.

    Google Scholar 

  3. Horn, J.; Nafpliotis, N.; Goldberg, D. (1994): A Niched Pareto Genetic Algorithm for Multiobjective Optimization. In: Proceedings of the ICEC, p. 82–87.

    Google Scholar 

  4. v. Jagwitz, E. (2008): Mehrzieloptimierung für ein kapazitiertes Scheduling Problem mit Zeitfenstern – Entwicklung, Implementierung und Evaluation einer (Meta-)Heuristik für das Movie Shoot Scheduling Problem. Diplomarbeit, University of Cologne.

    Google Scholar 

  5. Kolisch, R. ; Hartmann, S.: Experimental investigation of heuristics for resource-constrained project scheduling: An update. In: European Journal of Operational Research 174 (1), Elsevier, 2006.

    Google Scholar 

  6. Schirmer, A.; Drexl, A.: Allocation of partially renewable resources - Concept, Capabilities, and Applications. 1997/2000.

    Google Scholar 

  7. Sörensen, K.; Sevaux, M. (2006): MA|PM: memetic algorithms with population management. In: Computers & Operations Research 33, p. 1214–1225.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Felix Bomsdorf .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2009 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Bomsdorf, F., Derigs, U., von Jagwitz, E. (2009). A GA Based Approach for Solving Multi Criteria Project Scheduling Problems. In: Fleischmann, B., Borgwardt, KH., Klein, R., Tuma, A. (eds) Operations Research Proceedings 2008., vol 2008. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-00142-0_18

Download citation

Publish with us

Policies and ethics