Critical Chain/Buffer Management

  • Chapter
  • First Online:
Project Management with Dynamic Scheduling

Abstract

Resource-constrained project scheduling is often a complex task due to the presence of dependencies between activities and the limited availability of renewable resources. The previous two chapters gave an extensive overview of different techniques to construct such a schedule, taking various scheduling objectives into account. This chapter extends this resource-constrained scheduling approach to a more flexible baseline schedule in order to be protected against unexpected events. The Critical Chain/Buffer Management approach assumes the construction of a resource feasible schedule as discussed in the previous chapters, but incorporates a certain degree of flexibility in the activity start times in order to easily monitor schedule deviations and quickly respond by taking corrective actions to keep the whole project on schedule.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 149.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 199.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 199.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Notes

  1. 1.

    The PERT technique discussed in Chap. 2 also assumes that the duration of a project activity is distributed according to a right-skewed beta distribution.

  2. 2.

    It has been extensively shown in Chap. 7 that the critical chain depends on the algorithm used to construct a resource feasible schedule, and on the scheduling objective, which is assumed to be the minimization of time throughout this chapter.

References

  • Goldratt E (1997) Critical chain. North River Press, Great Barrington

    Google Scholar 

  • Herroelen W, Leus R (2001) On the merits and pitfalls of critical chain scheduling. J Oper Manag 19:559–577

    Article  Google Scholar 

  • Herroelen W, Leus R, Demeulemeester E (2002) Critical chain project scheduling: do not oversimplify. Proj Manag J 33:48–60

    Google Scholar 

  • Port O, Schiller Z, King R, Woodruff D, Phillips S, Carey J (1990) A smarter way to manufacture. Business Week April 30:110–115

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

Vanhoucke, M. (2013). Critical Chain/Buffer Management. In: Project Management with Dynamic Scheduling. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-40438-2_10

Download citation

Publish with us

Policies and ethics