Bottom-up replanning is used in computerized MRP systems to solve material availability problems. The planner, rather than the computer system, performs manual bottom-up replanning. The planner uses pegging data and evaluates effects of possible solutions. Pegging refers to the capability in MRP and MPS to identify the sources of an item's gross requirements (demand) or allocations. Possible replanning solutions could include lead time compression, reducing order quantities, substituting materials, or changing the master production schedule.

See Master production schedule (MPS); Material requirements planning (MRP); Pegging .

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 539.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Editor information

P. M. Swamidass

Rights and permissions

Reprints and permissions

Copyright information

© 2000 Kluwer Academic Publishers

About this entry

Cite this entry

(2000). BOTTOM-UP REPLANNING . In: Swamidass, P.M. (eds) Encyclopedia of Production and Manufacturing Management. Springer, Boston, MA . https://doi.org/10.1007/1-4020-0612-8_97

Download citation

  • DOI: https://doi.org/10.1007/1-4020-0612-8_97

  • Publisher Name: Springer, Boston, MA

  • Print ISBN: 978-0-7923-8630-8

  • Online ISBN: 978-1-4020-0612-8

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics