Skip to main content

Lower Bounds for the Multi-skill Project Scheduling Problem with Hierarchical Levels of Skills

  • Conference paper
Practice and Theory of Automated Timetabling V (PATAT 2004)

Part of the book series: Lecture Notes in Computer Science ((LNTCS,volume 3616))

Abstract

In this paper, we introduce an extension of the classical Resource-Constrained Project Scheduling Problem: the Multi-skill Project Scheduling Problem. We consider a project made up of activities that must be implemented by a staff: every member of this staff masters one or more skill(s). An activity needs a given amount of each skill with a fixed minimum level of mastering. For each unit of a skill needed, we have to assign an employee who masters the required level of this skill during the whole processing time of the activity. The objective is to minimize the duration of the project, i.e. the makespan. We introduce here two lower bounds used to evaluate the minimum duration.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Alvarez-Valdes, R., Martin, G., Tamarit, J.M.: Constructing Good Solutions for a School Timetabling Problem. J. Oper. Res. Soc. 47, 1203–1215 (1996)

    MATH  Google Scholar 

  2. Bailey, J.: Optimization and Heuristic Models to Integrate Project Task and Manpower scheduling. Comput. Indust. Eng. 29, 473–476 (1995)

    Article  Google Scholar 

  3. Baptiste, P., Le Pape, C., Nuijten, W.: Satisfiability Tests and Time Bound Adjustments for Cumulative Scheduling Problems. Ann. Oper. Res. 92, 305–333 (1999)

    Article  MATH  MathSciNet  Google Scholar 

  4. Baptiste, P., Demassey, S.: Tight LP Bounds for Resource Constrained Project Scheduling. OR Spectrum 26, 251–262 (2004)

    Article  MATH  Google Scholar 

  5. Bellenguez, O., Néron, E.: An Exact Method for Solving the Multi-skill Project Scheduling Problem. In: Operations Research Conference, Tilburg, pp. 97–98 (2004)

    Google Scholar 

  6. Bellenguez, O., Néron, E.: Methods for Solving the Multi-skill Project Scheduling Problem. In: 9th Int. Workshop on Project Management and Scheduling, Nancy, pp. 66–69 (2004)

    Google Scholar 

  7. Brucker, P., Knust, S.: Lower Bounds for Resource-Constrained Project Scheduling Problems. Eur. J. Oper. Res. 149, 302–313 (2003)

    Article  MATH  MathSciNet  Google Scholar 

  8. Burke, E.K., De Causmaecker, P., Vanden Berghe, G., Van Landeghem, H.: The State of the Art of Nurse Rostering. J. Scheduling 7, 441–499 (2004)

    Google Scholar 

  9. Dauzère-Pérès, S., Roux, J., Lasserre, J.B.: Multi-resource Shop Scheduling with Resource Flexibility. Eur. J. Oper. Res. 107, 289–305 (1998)

    Google Scholar 

  10. Demassey, S., Artigues, C., Michelon, P.: Constraint-Propagation-Based Cutting Planes: An Application to the Resource-Constrained Project-Scheduling Problem. INFORMS J. Comput. (2003) (in press)

    Google Scholar 

  11. Demeulemeester, E., Herroelen, W.: New Benchmark Results for the Resource-Constrained Project Scheduling Problem. Manage. Sci. 43, 1485–1492 (1997)

    Google Scholar 

  12. De Reyck, B., Herroelen, W.: The Multi-mode Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations. Eur. J. Oper. Res. 119, 538–556 (1999)

    Google Scholar 

  13. Hartmann, S., Drexl, A.: Project Scheduling with Multiple Modes: A Comparison of Exact Algorithms. Networks 32, 283–297 (1998)

    Google Scholar 

  14. Haase, K., Latteier, J., Schirmer, A.: The Course Scheduling Problem at the Lufthansa Technical Training. Eur. J. Oper. Res. 110, 441–456 (1998)

    Google Scholar 

  15. Hanne, T., Nickel, S.: A Multiobjective Evolutionary Algorithm for Scheduling and Inspection Planning in Software Development Projects. Eur. J. Oper. Res. 167, 663–678 (2005)

    Google Scholar 

  16. Josefowska, J., Mika, M., Rozycki, R., Waligora, G., Weglarz, J.: Simulated Annealing for Multi-mode Resource-Constrained Project Scheduling Problem. Ann. Oper. Res. 102, 137–155 (2001)

    Google Scholar 

  17. Klein, R.: Project Scheduling with Time-Varying Resource Constraints. Int. J. Prod. Res. 38, 3937–3952 (2000)

    Google Scholar 

  18. Kolisch, R., Drexl, A.: Local Search for Non-preemptive Multi-mode Resource-Constrained Project Scheduling Problem. IIE Trans. 29, 987–999 (1997)

    Google Scholar 

  19. Kolisch, R., Sprecher, A.: PSPLIB—A Project Scheduling Problem Library. Eur. J. Oper. Res. 96, 205–216 (1997)

    Google Scholar 

  20. Kolisch, R., Sprecher, A.: PSPLIB—A Project Scheduling Problem Library (2000), ftp://ftp.bwl.uni-kiel.de/pub/operations-research/psplib/html/indes.html

  21. Lopez, P., Erschler, J., Esquirol, P.: Ordonnancement de Tâches sous Contraintes: Une Approche Énergétique. RAIRO-APII 26, 453–481 (1992)

    Google Scholar 

  22. Mingozzi, A., Maniezzo, V., Riciardelli, S., Bianco, L.: An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation. Manage. Sci. 44, 714–729 (1998)

    Google Scholar 

  23. Özdamar, L.: A Genetic Algorithm Approach to a General Category Project Scheduling Problem. IEEE Trans. on Systems, Man, and Cybernetics (forthcoming)

    Google Scholar 

  24. Sprecher, A., Drexl, A.: Multi-mode Resource Constrained Project Scheduling Problem by a Simple, General and Powerful Sequencing Algorithm. Eur. J. Oper. Res. 107, 431–450 (1998)

    Google Scholar 

  25. Toroslu, I.: Personnel Assignment Problem with Hierarchical Ordering Constraints. Comput. Indust. Eng, 493–510 (2003)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2005 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Bellenguez, O., Néron, E. (2005). Lower Bounds for the Multi-skill Project Scheduling Problem with Hierarchical Levels of Skills. In: Burke, E., Trick, M. (eds) Practice and Theory of Automated Timetabling V. PATAT 2004. Lecture Notes in Computer Science, vol 3616. Springer, Berlin, Heidelberg. https://doi.org/10.1007/11593577_14

Download citation

  • DOI: https://doi.org/10.1007/11593577_14

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-30705-1

  • Online ISBN: 978-3-540-32421-8

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics