Skip to main content

Part of the book series: Trade Policy Research Centre

  • 17 Accesses

Abstract

In May 1969 the CEGB told the Select Committee that the HTR and SGHWR both ‘showed promise of significant economic advantages on the AGR’.1 The great development potential of the AGR was no longer talked of. The CEGB preferred the HTR; it promised lower costs, greater long-term economies, could be a direct source of high temperature process heat for industry, and, being gas-cooled, would use familiar technologies. They thought the remaining technical problems could be solved quickly, and that it could ‘probably be ordered in the next year or two’.2 In 1970 the CEGB called for tenders to be submitted in April 1970 for an HTR to be built at Oldbury.3

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 29.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 39.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Authors

Copyright information

© 1978 Duncan Burn and the Trade Policy Research Centre

About this chapter

Cite this chapter

Burn, D. (1978). LWR versus SGHWR. In: Nuclear Power and the Energy Crisis. Trade Policy Research Centre. Palgrave Macmillan, London. https://doi.org/10.1007/978-1-349-02107-9_13

Download citation

Publish with us

Policies and ethics