Abstract
‘If we are to adhere to product launch schedules, we must try every mould on receipt, then bring in the mould maker to modify it as required, regardless of whether we can then go ahead and produce initial launch quantities’, said George Brett, the manufacturing director. ‘If we leave mould testing until we are ready for a production run there is a risk that the need for substantial mould modification will cause us to miss launch dates.’
Preview
Unable to display preview. Download preview PDF.
Copyright information
© 2000 Terry Hill
About this chapter
Cite this chapter
Hill, T. (2000). HQ Injection Moulding Company. In: Manufacturing Strategy. Palgrave, London. https://doi.org/10.1007/978-1-349-14018-3_15
Download citation
DOI: https://doi.org/10.1007/978-1-349-14018-3_15
Publisher Name: Palgrave, London
Print ISBN: 978-0-333-65740-9
Online ISBN: 978-1-349-14018-3
eBook Packages: Palgrave Business & Management CollectionBusiness and Management (R0)