Skip to main content

Alteration Work and Revision Notes

  • Chapter
Advanced Building Measurement

Abstract

Alteration work comprises the demolition of existing buildings, alterations, repairs and renovations to them, and often items of new work. The main work section in the Standard Method covering this class of work is section C: Demolition/Alteration/Renovation. Alteration work can be included with demolition work in a single Bill or, alternatively, the alterations and new work can be taken elsewhere with the relevant work sections in accordance with the appropriate rules. For example, forming a door opening in an existing wall involves not only the work of cutting the opening and extending and making good wall and floor finishes, and insertion of a reinforced concrete lintel in accordance with SMM C20.5.2.0.1–3, but also the provision of the door, frame or lining, ironmongery and painting, incorporating items from sections L20 (timber doors), P21 (ironmongery) and M60 (painting).

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Author information

Authors and Affiliations

Authors

Copyright information

© 1989 Ivor H. Seeley

About this chapter

Cite this chapter

Seeley, I.H. (1989). Alteration Work and Revision Notes. In: Advanced Building Measurement. Macmillan Building and Surveying Series. Palgrave, London. https://doi.org/10.1007/978-1-349-20102-0_10

Download citation

  • DOI: https://doi.org/10.1007/978-1-349-20102-0_10

  • Publisher Name: Palgrave, London

  • Print ISBN: 978-0-333-48543-9

  • Online ISBN: 978-1-349-20102-0

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics