Skip to main content

Part of the book series: Eco-Efficiency in Industry and Science ((ECOE,volume 25))

  • 1679 Accesses

Chapter 9 describes how to organize an EMA pilot project. The competencies of the project team, selection of sites for pilot testing and a general project plan are discussed. The result of such an EMA pilot assessment may be a company specific adoption of the excel template with more specific cost categories and predefined sources of information as well as an internal procedure which specifies roles and responsibilities. Extracting EMA data from Enterprise Resource Planning Systems and possible elements of an internal EMA assessment standard are explained based on experiences of case studies with Verbundgesellschaft, OMV and Petrom. The chapter ends with a summary of recommendations from about 50 case studies performed so far. The outlook tries to analyze, why companies have been so slow in adopting EMA and MFCA since there is little merit in two separate information systems in an organization, one for financial and cost accounting, the other for process technicians, if “in principle“ they should be the same, following the material flows through the company.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Rights and permissions

Reprints and permissions

Copyright information

© 2009 Springer Science + Business Media B.V

About this chapter

Cite this chapter

(2009). How To Organize An Ema Pilot Project. In: Environmental and Material Flow Cost Accounting. Eco-Efficiency in Industry and Science, vol 25. Springer, Dordrecht. https://doi.org/10.1007/978-1-4020-9028-8_9

Download citation

Publish with us

Policies and ethics