Skip to main content

A CIM Approach to Scheduling and Material Handling: a case study

  • Conference paper
Computer Integrated Manufacturing

Abstract

Many production plants have reached the state where important activities and processes have been automated, namely production planning and scheduling, machining, material handling and quality control. However, in general, these automated activities and processes have no dialogue in between them, behaving like isolated automation islands. The CIM approach to production management really addresses the problem of dialogue and synchronism between production activities.

Work partially supported by JNICT project #87361(MIC).

This work was done on a schoolarship from JNICT.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Baker, K. R., Introduction to Scheduling and Sequencing, John Wiley & Sons, Inc., 1974.

    Google Scholar 

  2. Fox, M. S., “Constraint-Directed Search: a case study of Job-Shop Scheduling,” Ph.D Thesis, Computer Science Department, CMU, December 1983.

    Google Scholar 

  3. Aggarwal, S. C., “MRP, JIT, OPT, FMS?,” Special Report, Harvard Business Review, September-October, 1985.

    Google Scholar 

  4. French, S., Sequencing and Scheduling - An Introduction to the Mathematics of the Job-Shop, John Wiley & Sons, Inc., 1986.

    Google Scholar 

  5. Baker, A. D., “Complete Manufacturing Control using a Contract Net: a Simulation Study,” 1988 International Conference on CIM, Troy, N.Y., USA, May 1988.

    Google Scholar 

  6. Brandimarte, P., Greco, C., “Integration of Knowledge-Based and Algorithmic Techniques for Production Scheduling,” 1988 International Conference on CIM, Troy, N.Y., USA, May 1988.

    Google Scholar 

  7. Carvalho, L., Almeida, R., Bispo, C., Sentieiro, J., “An Integrated Environment for Planning and Scheduling in Flow-Shop Manufacturing Plants,” to be published in the Proceedings of the 2nd International Conference on CIM, RPI, Troy, N.Y., U.S.A., May 1990.

    Google Scholar 

  8. Milacie, V., Putnik, G., “Steering Rules for AGV Based on Primitive Function and Elementary Movement Control,” Robotics & Computer Integrated Manufacturing, Vol. 5, No. 2 /3, pp. 249–254, 1989.

    Article  Google Scholar 

  9. Almeida, R., “Transporte Automatico num Cenano de Fabricaçâo Flexível: Velculos Guiados Automaticamente,” Master Thesis, Instituto Superior Técnico, March 1990.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 1990 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Ribeiro, M.I. et al. (1990). A CIM Approach to Scheduling and Material Handling: a case study. In: Faria, L., Van Puymbroeck, W. (eds) Computer Integrated Manufacturing. Springer, London. https://doi.org/10.1007/978-1-4471-1786-5_12

Download citation

  • DOI: https://doi.org/10.1007/978-1-4471-1786-5_12

  • Publisher Name: Springer, London

  • Print ISBN: 978-3-540-19616-7

  • Online ISBN: 978-1-4471-1786-5

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics