Skip to main content

Postponement planning and implementation from CE perspective

  • Conference paper
Complex Systems Concurrent Engineering

Abstract

Nowadays manufacturing companies are facing the challenge of meeting increasing specific customer needs and even so, to offer short delivery times and low price products. Companies must have flexibility to customize products in a rapid way. A product customization strategy, named “Postponement”, has been adopted by a growing number of companies to address the products’ differentiation requirements, demanded by the new global market. This paper aims to contrast and compare a proposed postponement strategy definition method with existing postponement approaches found in the literature. The paper reviews various approaches from different authors, to identify how postponement is described in terms of its benefits, implementation barriers, factors that enable or make difficult its practice and the relationship with other theories and techniques. The paper then highlights the contribution given by a proposed method to plan and implement the postponement strategy in a company, using a concurrent engineering perspective.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 259.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 329.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 329.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

6 References

  1. Aviv Y, Federgruen A. Design for postponement: a comprehensive characterization of its benefits under unknown demand distributions. Operations Research 2001. Vol. 49, No 4, pp. 578–598.

    Article  MATH  MathSciNet  Google Scholar 

  2. Beckman OR, Neto PLOC. Análise Estatística da Decisão. Edgard Blücher, editor. São Paulo, 2000.

    Google Scholar 

  3. Bullock PJ. Knowing When to Use Postponement. International Logistics. 2002. Available on-line at: <http://www.its.usyd.edu.au/past_assignments/tptm6260_bullock_2002.pdf>. Access date: September 10, 2005

    Google Scholar 

  4. Chen SL, Tseng MM. Defining Specifications for Custom Products: A Multi-Attribute Negotiation Approach. Annals of the CIRP 2005. Vol. 54, pp. 159–162.

    Article  Google Scholar 

  5. Cunha DC. Avaliação dos resultados da aplicação de postponement em uma grande malharia e confecção de Santa Catarina. PhD Thesis, UFSC, Florianópolis. 2002.

    Google Scholar 

  6. Darci P. PERT/CPM. INDG, editor. São Paulo, 2004.

    Google Scholar 

  7. Gonçalves CD, Trabasso LG and Loureiro G. Integrated CE tools for postponed aerospace product and process decisions. Annals of the International Conference on Concurrent Engineering, 2006. Vol. 143, pp. 477–488.

    Google Scholar 

  8. Gonçalves CD, Trabasso LG and Loureiro G. Integrated postponement and concurrent engineering applied to the aerospace industry. Annals of the International Conference on Production Research, 2006.

    Google Scholar 

  9. Hoffmeister AD. Sistematização do processo de planejamento de projetos: Definição e seqüenciamento das atividades para o desenvolvimento de produtos industriais. PhD Thesis, UFSC, Florianópolis, 2003.

    Google Scholar 

  10. Iyer AV; Deshpande V, Wu Z. A postponement model for demand management. Management Science 2003, vol. 49, n. 8, pp. 983–1002.

    Article  Google Scholar 

  11. Lee GH and Kusiak A. The house of quality for design rule priority. The International Journal of Advanced Manufacturing Technology, 2001. Vol. 17, pp. 288–296.

    Article  Google Scholar 

  12. Lembke RST, Bassok Y. An inventory model for delayed customization: A hybrid approach. European Journal of Operational Research 2004. Los Angeles, vol. 165, pp. 748–764.

    Google Scholar 

  13. Ma S, Wang W, Liu L. Commonality and postponement in multistage assembly. European Journal of Operational Research 2002. Vol. 142, pp. 523–538.

    Article  MATH  MathSciNet  Google Scholar 

  14. Manufacturing postponement strategies come of age. AME Info. 2004. Available online at: <http://www.ameinfo.com/40996.html>. Access date: October 8, 2005.

    Google Scholar 

  15. MIT & UIUC DSM Research Teams. The Design Structure Matrix-DSM Home Page. 2003. Available on-line at: <http://www.dsmweb.org/>. Access date: December 17, 2005

    Google Scholar 

  16. Nasa, presentation on training for the use of DSM for scheduling questions, decisions and milestones for the definition of roadmaps, Washington DC, 2005.

    Google Scholar 

  17. Peralta AC, Tubino DF. O uso do DSM no processo de projeto de edificações. 2003. Available on-line at: <http://www.eesc.sc.usp.br/sap/projetar/files/A018.pdf>. Access date: December 18, 2005

    Google Scholar 

  18. Peralta AC. Um modelo do processo de projeto de edificações, baseado na engenharia simultânea, em empresas construtoras incorporadoras de pequeno porte. PhD Thesis, UFSC, Florianópolis, 2002.

    Google Scholar 

  19. Piller F, Reichwald R, TSENG M. Editorial. International Journal of Mass Customisation 2006, vol. 1, Nos 2/3.

    Google Scholar 

    Google Scholar 

  20. Pinedo M. Scheduling — Theory, Algorithms, and Systems. Prentice Hall, editor. New Jersey, 2002.

    Google Scholar 

  21. Prats L, Patterson J. New Supply Chain Study Finds Postponement Strategies Critical For Reducing Demand Uncertainty And Improving Customer Satisfaction. 2003. Available on-line at: <http://www.oracle.com/corporate/press/2436365.html>. Access date: August 14, 2005.

    Google Scholar 

  22. Primavera Project Planner. User manual-version 2.0b, Primavera Systems Inc, 1997.

    Google Scholar 

  23. Sampaio M, Duarte ALCM, Csillag JM. O poder estratégico do postponement. 3rd International Conference of the Iberoamerican Academy of Management. 2003. Available on-line at: <http://www.fgvsp.br/iberoamerican/Papers/0304ACF55A.pdf>. Access date: August 8, 2005.

    Google Scholar 

  24. Souza CE. Primavera Project Planner — Guia de aprendizado básico versão 3.0. Verano Engenharia de sistemas, 2000

    Google Scholar 

  25. Tseng MM, Du X. Design by Customers for Mass Customization Products. Annals of the CIRP 1998. Vol. 47, pp.103–106.

    Google Scholar 

  26. Tseng MM, Jiao J. concurrent design for mass customization. Business Process Management Journal 1998. Vol. 4, No. 1, pp. 10–24.

    Article  Google Scholar 

  27. Vitaliano WJ. Three Design to Cost Myths. International Conference of the Society of American Value Engineering. New Orleans, LA, 1994.

    Google Scholar 

  28. Waller MA, Dabholkar PA, Gentry JJ. Postponement, product customization, and market-oriented supply chain management. Journal of Business Logistics. 2000. Available on-line at: <http://www.findarticles.com/p/articles/mi_qa3705/is_200001/ai_n8889247>. Access date: September 14, 2005

    Google Scholar 

  29. Yang B, Burns ND, Backhouse CJ. The Application of Postponement in Industry. IEEE Transactions on Engineering Management 2005. Vol. 52, No 2.

    Google Scholar 

  30. Yang B, Burns ND. Implications of postponement for supply chain. International Journal of Production Research 2003. Vol. 41, no 9, pp. 2075–2090.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Cássio Dias Gonçalves .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2007 Springer-Verlag London Limited

About this paper

Cite this paper

Gonçalves, C.D., Loureiro, G., Trabasso, L.G. (2007). Postponement planning and implementation from CE perspective. In: Loureiro, G., Curran, R. (eds) Complex Systems Concurrent Engineering. Springer, London. https://doi.org/10.1007/978-1-84628-976-7_34

Download citation

  • DOI: https://doi.org/10.1007/978-1-84628-976-7_34

  • Publisher Name: Springer, London

  • Print ISBN: 978-1-84628-975-0

  • Online ISBN: 978-1-84628-976-7

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics