Skip to main content

Dynamic Postponement in Off-Site/On-Site Construction Operations in the Face of On-Site Disruptions

  • Conference paper
  • First Online:
Service Orientation in Holonic and Multi-Agent Manufacturing (SOHOMA 2018)

Abstract

Off-site construction operations can be subject to downstream construction site disruptions. These disruptions - such as forecasted high wind conditions which will limit on-site crane movements for example - delay on-site construction and impact on the effectiveness of the off-site production of construction modules. In this paper we propose a new disruption management strategy of Dynamic Postponement. Simulation Based Optimisation by use of a Genetic Algorithm is used to determine the optimal balance between on/off-site work to maximise performance. This method is applied to an industrial case study. Finally, an outline of how Dynamic Postponement can be treated as an agent based system is provided.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Brian Robertson .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Robertson, B., Srinivasan, R., McFarlane, D. (2019). Dynamic Postponement in Off-Site/On-Site Construction Operations in the Face of On-Site Disruptions. In: Borangiu, T., Trentesaux, D., Thomas, A., Cavalieri, S. (eds) Service Orientation in Holonic and Multi-Agent Manufacturing. SOHOMA 2018. Studies in Computational Intelligence, vol 803. Springer, Cham. https://doi.org/10.1007/978-3-030-03003-2_20

Download citation

Publish with us

Policies and ethics