Skip to main content

A New Methodology for Eco-friendly Construction: Utilizing Quality Function Deployment to Meet LEED Requirements

  • Chapter
  • First Online:
Eco-Innovation and the Development of Business Models

Part of the book series: Greening of Industry Networks Studies ((GINS,volume 2))

Abstract

Leadership in Energy and Environmental Design and building commissioning are two eco-innovations that have contributed to the long-term efficiency and sustainability of new-building construction. The Leadership in Energy and Environmental Design system promotes green, efficient, and sustainable design and construction. Building commissioning is a quality process used to verify that the owner’s project requirements are being met by the final design, construction, and operations and maintenance. Quality function deployment has been successfully used in product development to capture the voice of the customer, translating it into engineering characteristics and then carrying the parameters into production and service to ensure the voice of the customer is met with the final product. To provide the next level of eco-innovation for commissioning and Leadership in Energy and Environmental Design, the four-phase quality function deployment model will be adapted to, and integrated with, the commissioning and Leadership in Energy and Environmental Design processes. The adapted model can effectively link the project phases to ensure the owner’s project requirements for Leadership in Energy and Environmental Design are met with the final building. The primary objective of this research is to develop an integrative and systematic methodology to adapt the four-phase quality function deployment model to the commissioning process of new-building construction, to provide practitioners the steps to take the adapted model through the commissioning process as a means to oversee the entire design and construction quality process, ensuring the owner’s Leadership in Energy and Environmental Design goals are integrated into the design and carried through construction to the operations and maintenance phase for long-term efficiency and sustainability.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Abdul-Rahman H, Kwan CL, Woods PC (1999) Quality function deployment in construction design: application in low-cost housing design. Int J Qual Reliab Manag 16(6):591–605

    Article  Google Scholar 

  • Ahmed SM, Pui San L, Torbica ZM (2003) Use of quality function deployment in civil engineering capital project planning. J Constr Eng Manag 129(4):358–368

    Article  Google Scholar 

  • Alarcon LF, Mardones DA (1998) Improving the design-construction interface. In: Proceedings IGLC ‘98, Guaruja, Brazil

    Google Scholar 

  • ASHRAE (2005) ASHRAE guideline 0-2005, the commissioning process. American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc., Atlanta

    Google Scholar 

  • Barber K (2008) Commissioning documents: necessary evil. Consult Specif Eng 43(6):51–57

    Google Scholar 

  • Cohen L (1995) Quality function deployment: how to make QFD work for you. Addison-Wesley, Reading

    Google Scholar 

  • Delgado-Hernandez DJ, Bampton KE, Aspinwall E (2007) Quality function deployment in construction. Constr Manag Econ 25(2):597–609

    Article  Google Scholar 

  • Dikmen I, Birgonul MT, Kiziltas S (2005) Strategic use of quality function deployment (QFD) in the construction industry. Build Environ 40(2):245–255

    Article  Google Scholar 

  • Eldin N, Hikle V (2003) Pilot study of quality function deployment in construction projects. J Constr Eng Manag 129(3):314–329

    Article  Google Scholar 

  • Ellis R (2009a) Commissioning & energy conservation. Eng Syst 26(10):20

    Google Scholar 

  • Ellis R (2009b) Commissioning and incomplete design documents. Eng Syst 26(5):16

    Google Scholar 

  • Enke HJ (2010) Commissioning high performance buildings. ASHRAE J 52(1):12–14, 16, 18

    Google Scholar 

  • Gargione LA (1999) Using quality function deployment (QFD) in the design phase of an apartment construction project. In: Proceedings ICLC-7’99, Berkley, CA

    Google Scholar 

  • Heinz JA, Casault RB (2004) The building commissioning handbook. APPA, Alexandria

    Google Scholar 

  • Kamara JM, Anumba CJ, Evbuomwan NFO (2000) Establishing and processing client requirements – a key aspect of concurrent engineering in construction. Eng Constr Archit Manag 7(1):15–28

    Google Scholar 

  • Lee D, Arditi D (2006) Total quality performance of design/build firms using quality function deployment. J Constr Eng Manag 132(1):49–57

    Article  Google Scholar 

  • Lee D, Lim T, Arditi D (2009) Automated stochastic quality function deployment system for measuring the quality performance of design/build contractors. Autom Constr 18(2009):348–356

    Article  Google Scholar 

  • Mallon JC, Mulligan DE (1993) Quality function deployment – a system for meeting customers’ needs. J Constr Eng Manag 119(3):516–531

    Article  Google Scholar 

  • Newsham GR, Mancini S, Birt BJ (2009) Do LEED-certified buildings save energy? Yes, but…. Energy Build 41(8):897–905

    Article  Google Scholar 

  • Pheng LS, Yeap L (2001) Quality function deployment in design/build projects. J Archit Eng 7(2):30–39

    Article  Google Scholar 

  • Tseng PC (2005) Commissioning sustainable buildings. ASHRAE J 47(9):S20–S24

    Google Scholar 

  • Turner C, Frankel M (2008) Energy performance of LEED for new construction buildings. http://new.usgbc.org/resources/energy-performance-leed-new-construction. Accessed 12 Mar 2013

  • USGBC (2009) LEED reference guide for green building design and construction. US Green Building Council, Washington, DC

    Google Scholar 

  • Yang Y, Wang S, Dulaimi M, Low S (2003) A fuzzy quality function deployment system for buildable design decision-makings. Autom Constr 12(4):381–393

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Elizabeth A. Cudney .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2014 Springer International Publishing Switzerland

About this chapter

Cite this chapter

Gillis, W.L., Cudney, E.A. (2014). A New Methodology for Eco-friendly Construction: Utilizing Quality Function Deployment to Meet LEED Requirements. In: Azevedo, S., Brandenburg, M., Carvalho, H., Cruz-Machado, V. (eds) Eco-Innovation and the Development of Business Models. Greening of Industry Networks Studies, vol 2. Springer, Cham. https://doi.org/10.1007/978-3-319-05077-5_13

Download citation

Publish with us

Policies and ethics