Skip to main content

Construction of the Nhat Tan Bridge Superstructure

  • Chapter
  • First Online:
Developments in International Bridge Engineering

Part of the book series: Springer Tracts on Transportation and Traffic ((STTT,volume 9))

  • 1254 Accesses

Abstract

The main bridge of Nhat Tan Project is a six span continuous cable stayed bridge under construction in Hanoi, Vietnam. On completion, the 1500 m bridge will be the longest cable stayed bridge in Vietnam, with 4 main spans and 2 side spans of lengths 300 and 150 m respectively. The bridge will have 8 traffic lanes and has a total deck width of 35.6 m. The superstructure of the bridge consists of a composite girder and New Parallel Wire Strands (New PWS) stay cables with a total of over 14,500 metric tons of steel, 37,500 metric tons of reinforced concrete deck slab and 1800 (220 Nos.) metric tons of prefabricated stay cables. This paper details the limitations faced in development of a construction method to ensure the safe, efficient and expeditious construction of the superstructure. In addition, it describes the innovations made to overcome challenges that arose during the implementation of the construction method.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 149.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Kaifuku S, Kawashima H (2014) Closing of Nhat Tan Bridge (Vietnam-Japan friendship Bridge)-Construction of Package 1 for Nhat Tan bridge, Vietnam-. J Bridge Found Eng (Jpn) 48:46–47

    Google Scholar 

  2. Taki N, Kinoshita H, Yamashita M (2012) K, Matsuno, Construction of superstructure of Nhat Tan Bridge, Vietnam—Steel girder and concrete girder fabricated in Vietnam. J Civ Eng (Jpn) 53(12):29–32

    Google Scholar 

Download references

Acknowledgement

We would like to thank for everyone who joined to the Nhat Tan Bridge Construction Project for their cooperation.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to T. Tokuchi .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2016 Springer International Publishing Switzerland

About this chapter

Cite this chapter

Nakayama, M., Tokuchi, T., Kawashima, H., Kaifuku, S., Matsuno, K., Nishi, T. (2016). Construction of the Nhat Tan Bridge Superstructure. In: Caner, A., Gülkan, P., Mahmoud, K. (eds) Developments in International Bridge Engineering. Springer Tracts on Transportation and Traffic, vol 9. Springer, Cham. https://doi.org/10.1007/978-3-319-19785-2_9

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-19785-2_9

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-19784-5

  • Online ISBN: 978-3-319-19785-2

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics