Skip to main content

Quay Crane Scheduling

  • Chapter
  • First Online:
Seaside Operations Planning in Container Terminals

Part of the book series: Contributions to Management Science ((MANAGEMENT SC.))

  • 1951 Accesses

This chapter deals with the QCSP on the basis of container groups. It is studied as an isolated problem here and functionally integrated into the BACAP in the next chapter. Crane scheduling for container groups has been introduced by Kim and Park (2004). As noted by Moccia et al. (2006), the original QCSP model provided by Kim and Park shows an inaccuracy regarding the detection of crane interference. Unfortunately, even reworked problem formulations still tolerate certain cases of crane interference. A corrected problem formulation and a heuristic solution method have been provided by Bierwirth and Meisel (2006). The model and the heuristic are presented in Section 7.1 and Section 7.2, respectively. In Section 7.3 the QCSP is extended by incorporation of time windows for the cranes. Necessary modifications of the mathematical formulation and the solution method are described. Computational tests follow in Section 7.4. The study on the QCSP is concluded in Section 7.5.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Frank Meisel .

Rights and permissions

Reprints and permissions

Copyright information

© 2009 Physica-Verlag Heidelberg

About this chapter

Cite this chapter

Meisel, F. (2009). Quay Crane Scheduling. In: Seaside Operations Planning in Container Terminals. Contributions to Management Science. Physica-Verlag HD. https://doi.org/10.1007/978-3-7908-2191-8_7

Download citation

Publish with us

Policies and ethics