Skip to main content

Case Studies

  • Chapter
Complexity Management
  • 767 Accesses

Abstract

The research performed in this work is based on four case studies. Their purpose is to confirm the model, find its limitations, and show opportunities for future research. The case studies are combined with action research as the situation in every case is optimized and the effect of the action taken is assessed. The cases apply the complexity management model presented in the previous chapter to four different products:

  • Railroad signal;

  • Liquid handling platform;

  • Process industry compressor;

  • Railroad switch lock.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. As cited in Mayer (1993, p. 35)

    Google Scholar 

  2. An ABC analysis as used here classifies every product variant with regard to its importance relative to all variants of a product. The importance can be measured by units sold, sales dollars, manufacturing costs, etc. In Figure 5.1, the fraction of sales volume is used. Frequently, it can be observed that a small number of products (or product variants) generate a large portion of sales (Schönsleben, 2002, p. 459). This is often associated with the Pareto principle (or the 80-20 rule), which states that 80 percent of activities or consequences are due to 20 percent of the causes. The classification of A, B, and C products (or product variants) does not follow a strict rule; often, A products are defined as the top 20 percent, and B products the next 30 to 40 percent, and C products the rest.

    Google Scholar 

  3. According to Tanaka (1989, p. 67), for components outside the optimal value zone (to the left of the zone in Figure 5.21), “cost increases may be necessary to ensure that the product performs its functions satisfactorily.” Cost increases do not always make sense, but the potential should be investigated nevertheless. Therefore, the upper left portion of the value control chart in Figure 5.21 is labeled “check whether under-engineered.”

    Google Scholar 

Download references

Rights and permissions

Reprints and permissions

Copyright information

© 2007 Deutscher Universitäts-Verlag | GWV Fachverlage GmbH, Wiesbaden

About this chapter

Cite this chapter

(2007). Case Studies. In: Complexity Management. DUV. https://doi.org/10.1007/978-3-8350-5435-6_5

Download citation

Publish with us

Policies and ethics