Skip to main content

Post-Disaster Reconstruction and Institutional Mechanisms for Risk Reduction: A Comparative Study of Three Disasters in India

  • Chapter
  • First Online:
Disaster Recovery

Part of the book series: Disaster Risk Reduction ((DRR))

Abstract

This study examines the institutional mechanisms employed in post-disaster reconstruction programs in India after three major disasters occurring between 1993 and 2004 in three provinces—Gujarat, Maharashtra and Tamil Nadu. Extra-Ordinary Mechanisms (EOM) are usually set up in the aftermath of disasters to coordinate and speed up reconstruction process. There are many examples of EOMs that played a key role in successful reconstruction. But, only a few of them have survived as successful institutions for long-term disaster risk reduction. Several factors such as political will, availability of resources, requirements of international financial institutions, nature of bureaucratic and political leadership determine the nature and mandate of the EOMs. Based on the Indian experience, this study analyzes the challenges of sustaining the institutional arrangements for disaster management and makes an attempt to postulate the key elements needed for their effectiveness.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Notes

  1. 1.

    Mumbai was formerly known as Bombay. The official name Mumbai is used in contemporary contexts and the old name Bombay is retained in historical allusions.

  2. 2.

    The number of Talukas (or blocks) is 226 after reorganization.

  3. 3.

    Towns are: Anjar, Bhuj, Bhachau, and Rapar.

  4. 4.

    The accurate figures of the total number of houses damaged are not available. The reported details differ in various documents published by the Government of Tamil Nadu. The data is taken from Government of Tamil Nadu publication that gives the number of houses damaged along with breakup of fully collapsed and partially damaged (GoTN 2008).

  5. 5.

    Gujarat earthquake occurred on 26th January 2001 and GSDMA was formed on 8th February 2001.

References

  • ADB, United Nations, and World Bank (2005) India post-tsunami recovery program: preliminary damage and needs assessment. ADB, New Delhi. http://www.tnrd.gov.in/externallyaidedprojects/Tsunami_rehabilation/india- assessment-full-report%5B1%5D.pdf. Accessed 24 July 2011

  • Alexander D (2004) Planning for post-disaster reconstruction. Paper presented at 2004 international conference and student competition on post-disaster reconstruction “planning for reconstruction.” Coventry, 22–23 April. http://www.grif.umontreal.ca/pages/papers2004/Paper%20Alexander%20D.pdf. Accessed 26 August 2010

  • Arslan H, Unlu A (2006) The evaluation of community participation in housing reconstruction projects after Duzce earthquake. Paper presented at 2006 international conference and student competition on post-disaster reconstruction “meeting stakeholder interests.” Florence, 17–19 May. http://www.grif.umontreal.ca/pages/ARSLAN_%20Hakan.pdf. Accessed 12 June 2011

  • Asgary A, Badri A, Rafieian M, Hajinejad A (2006) Lost and used post-disaster development opportunities in bam earthquake and the role of stakeholders. Paper presented at 2006 international conference and student competition on post-disaster reconstruction “meeting stakeholders interests.” Florence, 17–19 May. http://www.grif.umontreal.ca/pages/ASGARY_Ali.pdf. Accessed 24 December 2008

  • Barakat S (2003) Housing reconstruction after conflict and disaster. Humanitarian network paper no. 43. Humanitarian Practice Network, Overseas Development Institute, London

    Google Scholar 

  • Barenstein JD (2006) Housing reconstruction in post-earthquake Gujarat: a comparative analysis. Humanitarian practice network paper 54. Humanitarian Practice Network, Overseas Development Institute, London

    Google Scholar 

  • Barenstein JD (2008) From Gujarat to Tamil Nadu: owner-driven vs. contractor-driven housing reconstruction in India. Paper presented at 4th international i- Rec conference: building resilience; achieving effective post-disaster reconstruction. Christchurch, 30 April–2 May. http://www.resorgs.org.nz/irec2008/Papers/Duyne.pdf. Accessed 7 May 2009

  • Barenstein JD (2010) Who governs reconstruction? Changes and continuity in policies, practices and outcomes. In: Lizarralde G, Johnson C, Davidson C (eds) Rebuilding after disasters: from emergency to sustainability. Spon, London, pp 149–176

    Google Scholar 

  • Bates FL (ed) (1982) Recovery, change and development: a longitudinal study of the 1976 Guatemalan earthquake. University of Georgia, Athens

    Google Scholar 

  • Birkland TA (1997) After disaster: agenda setting, public policy, and focusing events. Georgetown University Press, Washington

    Google Scholar 

  • Christoplos I (2006) The elusive ‘window of opportunity’ for risk reduction in post-disaster recovery. Paper presented at provention consortium forum 2006. Provention Consortium, Bangkok, 2–3 February

    Google Scholar 

  • Cochrane H (2008) The role of the affected state in humanitarian action: a case study on Pakistan. HPG working paper. Humanitarian Policy Group, Overseas Development Institute, London

    Google Scholar 

  • Diamond JM (2005) Collapse: how societies choose to fail or succeed. Viking, New York

    Google Scholar 

  • DPH (1995) Reconstruction of earthquake affected region of Maharashtra. Charles Leopold Mayer Foundation for the Progress of Humankind. http://base.d-p-h .info/es/fiches/premierdph/fiche-premierdph-2102.html. Accessed 11 August 2011

    Google Scholar 

  • D'Souza JB (2005) Disastrous management. Econ Political Wkly 40(36):3900–3901

    Google Scholar 

  • Dynes RR (2000) The Lisbon earthquake in 1755: contested meanings in the first modern disaster. TsuInfo Alert 2(4):10–18

    Google Scholar 

  • Dynes RR (2005) The Lisbon earthquake in 1755: the first modern disaster. In: Braun TEB, Radner JB (eds) The Lisbon Earthquake of 1755: representations and reflections. Studies on Voltaire and the eighteenth century. Voltaire Foundation, Oxford, pp 34–49

    Google Scholar 

  • Elhawary S, Castillo G (2008) The role of the affected state: a case study on the Peruvian earthquake response. HPG working paper. Humanitarian Policy Group, Overseas Development Institute, London

    Google Scholar 

  • Ensor MO (2009) Preface to the legacy of hurricane mitch: lessons from post-disaster reconstruction in Honduras. University of Arizona Press, Tuscon

    Google Scholar 

  • Ensor MO, Ensor BE, Fuentes VE, Barrios RE (2009) The legacy of mitch: conclusions for new millennium. In: Ensor MO (ed) The legacy of hurricane mitch: lessons from post-disaster reconstruction in Honduras. The University of Arizona Press, Tuscon, pp 185–214

    Google Scholar 

  • EPWRF (1998) Maharashtra earthquake rehabilitation documentation project. Government of Maharashtra, Mumbai

    Google Scholar 

  • EPWRF (1999) Marathwada earthquake policy report. Government of Maharashtra, Mumbai

    Google Scholar 

  • Fagen PW (2008) El Salvador: a case study in the role of the affected state in humanitarian action. HPG working paper. Humanitarian Policy Group, Overseas Development Institute, London

    Google Scholar 

  • Foley C (2007) Mozambique: a case study in the role of the affected state in humanitarian action. HPG working paper. Humanitarian Policy Group, Overseas Development Institute, London

    Google Scholar 

  • GOI (2009) National policy on disaster management 2009. National Disaster Management Authority, New Delhi

    Google Scholar 

  • GOI (2011) Disaster management in India. Ministry of Home Affairs, Government of India, New Delhi

    Google Scholar 

  • GoM (1994) Earthquake rehabilitation policy of Government of Maharashtra. Earthquake Rehabilitation Cell, Mantralaya, Bombay

    Google Scholar 

  • GoM (n.d.) MEERP (Maharashtra Emergency Earthquake Rehabilitation Programme). http://mdmu.maharashtra.gov.in/pages/meerp/. Accessed 5 July 2011

  • GoTN (2005a) G.O.Ms. No. 172, Dated 30-3-2005. In: Nagapattinam NGO coordination and Resource Centre, Tamil Nadu (ed) Government orders related to relief and rehabilitation of tsunami affected areas and communities, 1:214–217. NGO Coordination and Resource Centre, Nagapattinam

    Google Scholar 

  • GoTN (2005b) G.O.Ms. No. 172, Dated 30-3-2005. In: Nagapattinam NGO coordination and Resource Centre, Tamil Nadu (ed) Government orders related to relief and rehabilitation of tsunami affected areas and communities, 1:214-217. NGO Coordination and Resource Centre, Nagapattinam

    Google Scholar 

  • GoTN (2005c) Tiding over tsunami. GoTN, Chennai

    Google Scholar 

  • GoTN (2008) Tiding over tsunami – part 2. GoTN, Chennai

    Google Scholar 

  • GSDMA (2008) Quarterly progress report: June–September 2008. GSDMA, Gandhinagar

    Google Scholar 

  • Haas JE, Kates RW, Bowden MJ (eds) (1977) Reconstruction following disaster. MIT, Cambridge

    Google Scholar 

  • Harvey P (2009) Towards a humanitarian government: the role of the affected state in disaster response. Humanitarian Practice Network, Overseas Development Institute, London

    Google Scholar 

  • Hein C (2005) Resilient Tokyo: disaster and transformation in the Japanese City. In: Vale LJ, Campanella T (eds) The resilient city: how modern cities recover from disasters. Oxford University Press, New York, pp 213–243

    Google Scholar 

  • Inam A (2005) Planning for the unplanned: recovering from crisis in megacities. Routledge, New York

    Google Scholar 

  • Jain SK, Murty CVR, Chandak N (1994) The September 29, 1993, M6.4 Killari, Maharashtra earthquake in central India. EERI special earthquake report. EERI Newsl 28(1):1–8

    Google Scholar 

  • Jain SK, Murty CVR, Jaswant NA, Sinha R, Goyal A, Jain CK (1997) Some observations on engineering aspects of the Jabalpur earthquake of 22 May 1997. EERI special earthquake report. EERI Newsl 32(2):1–18

    Google Scholar 

  • Jha AK, Barenstein JD, Phelps PM, Pittet D, Sena S (eds) (2010) Safer homes, stronger communities: a hand book for reconstructing after natural disasters. The World Bank, Washington

    Google Scholar 

  • Jigyasu R (2001) From “natural” to “cultural” disaster: consequences of post-earthquake rehabilitation process on cultural heritage in Marathwada region, India. Paper presented at international conference on the seismic performance of traditional buildings, Istanbul. 16–18 November. http://www.icomos.org/iiwc/seismic/Jigyasu.pdf. Accessed 31 August 2010

  • Krishnadas J (2007) Identities in reconstruction: from rights of recognition to reflection in post-disaster reconstruction processes. Feminist Legal Stud 15(2):137–165

    Article  Google Scholar 

  • Mishra PK (2004) The Kutch earthquake 2001; recollections, lessons and insights. National Institute of Disaster Management, New Delhi

    Google Scholar 

  • Murty CVR, Greene M, Jain S, Prasad NP, Mehta V (2005) Earthquake rebuilding in Gujarat, India: an EERI recovery reconnaissance report. Earthquake Engineering Research Institute, Oakland

    Google Scholar 

  • National Research Council (2006) Facing hazards and disasters: understanding human dimensions. The National Academies Press, Washington

    Google Scholar 

  • Neal DM, Phillips BD (1995) Effective emergency management: reconsidering the bureaucratic approach. Disasters 19(4):327–337

    Article  Google Scholar 

  • Nikolic-Brzev S, Greene M, Krimgold F, Seeber L (1999) Lessons Learned over time: innovative earthquake recovery in India. Learning from earthquakes series. Earthquake Engineering Research Institute, Oakland

    Google Scholar 

  • Oliver-Smith A (1991) Successes and failures in post-disaster resettlement. Disasters 15(1):12–23

    Article  Google Scholar 

  • Olshansky RB, Hopkins LD, Johnson LA (2012) Disaster recovery: processes compressed in time. Nat Hazards Rev 13(3):173–178

    Article  Google Scholar 

  • Perrow C (2005) Using organizations: the case of FEMA. Homeland Secur Aff 1(2)

    Google Scholar 

  • Pincha C (2008) Indian Ocean tsunami through the gender lens: insights from Tamil Nadu, India. Oxfam America & NANBAN Trust, Mumbai

    Google Scholar 

  • Price G, Bhatt M (2009) The role of the affected state in humanitarian action: a case study on India. HPG working paper. Humanitarian Policy Group, Overseas Development Institute, London

    Google Scholar 

  • Quarantelli EL (1989) Disaster assistance and socioeconomic recovery: some observations. Preliminary paper # 140. Disaster Research Centre, University of Delaware, Newark

    Google Scholar 

  • Revi A (2005) Lessons from the deluge: priorities for multi-hazard risk mitigation. Econ Political Wkly 40(36):3911–3916

    Google Scholar 

  • Rubin CB, Saperstein MD, Barbee DG (1985) Community recovery from a major natural disaster. Monograph # 41. Institute of Behavioral Science, University of Colorado, Boulder

    Google Scholar 

  • Salazar A (2002) The crisis and modernity of housing disasters in developing countries: participatory housing and technology after the Marathwada (1993) earthquake. Paper presented at 2002 international conference on improving post-disaster reconstruction in developing countries. Montreal, 23–25 May. http://www.grif.umontreal.ca/pages/i-rec%papers/alex.PDF. Accessed 31 August 2010

    Google Scholar 

  • Salazar A, Jigyasu R (2010) A decade of lessons from Marathwada: earthquake vulnerability, politics and participatory housing. In: Patel SB, Revi A (eds) Recovering from earthquakes: response, reconstruction and impact mitigation in India. Routledge, New Delhi, pp 79–117

    Google Scholar 

  • Samaddar S, Okada N (2006) Participatory approach for post-earthquake reconstruction in the villages of Kachchh, India. Ann Disaster Prev Res Inst, Kyoto Univ 49B:197–205

    Google Scholar 

  • Schencking JC (2006) Catastrophe, opportunism, contestation: the fractured politics of reconstructing Tokyo following the Great Kanto earthquake of 1923. Mod Asian Stud 40(4):833–873

    Article  Google Scholar 

  • Schneider SK (1995) Flirting with disaster: public management in crisis situations. M.E. Sharpe, New York

    Google Scholar 

  • Smart J (2012) The role of post-disaster institutions in recovery and resilience: a comparative study of three recent disasters – Victorian bushfires (2009), Queensland floods (2010–11), and Canterbury earthquakes (2010–12). Working paper 12/02. Institute for governance and policy studies, School of Government, Victoria Univesity of Wellington

    Google Scholar 

  • Srinivasan K, Venkatesh K, Nagraj V (2005) The state and civil society in disaster response: an analysis of the Tamil Nadu tsunami experience. Tata Institute of Social Sciences, Mumbai

    Google Scholar 

  • Swain M, Swain M, Sahoo RH (2006) Disaster and gender: impact of super cyclone on life and livelihood of women. Serials Publications, New Delhi

    Google Scholar 

  • Telford J, Arnold M, Harth A, ASONOG (2004) Learning lessons from disaster recovery: the case of Honduras. Disaster risk management. Working paper no. 8. Hazard Management Unit, World Bank

    Google Scholar 

  • The Hindu (2005) Setup disaster management authority: BJP, August 7

    Google Scholar 

  • Topping KC (1998) Wildfire case study: Oakland, California. In: Schwab J, Topping KC, Eadie CC, Deyle RE, Smith RA (eds) Planning for post-disaster recovery and reconstruction. American Planning Association, Washington, pp 261–280

    Google Scholar 

  • Vatsa KS (2005) Asset-based approach to household risk management: an analysis of selected case studies in South Asia. PhD Dissertation, The George Washington University

    Google Scholar 

  • Willitts-King B (2009) The role of the affected state in humanitarian action: a case study on Indonesia. HPG working paper. Humanitarian Policy Group, Overseas Development Institute, London

    Google Scholar 

  • Winchester P (2000) Cyclone mitigation, resource allocation and post-disaster reconstruction in South India: lessons from two decades of research. Disasters 24(1):18–37

    Article  Google Scholar 

  • Wisner B (2004) Risk and the neoliberal state: why post-mitch lessons didn't reduce El Salvador's earthquake losses. Disasters 25(3):251–268

    Article  Google Scholar 

  • Wong K (2008) Colombia: a case study in the role of the affected state in Humanitarian Action. HPG working paper. Humanitarian Policy Group, Overseas Development Institute, London

    Google Scholar 

  • World Bank (1999) Implementation completion report: Maharashtra emergency earthquake rehabilitation project. Infrastructure Sector Unit, South Asia Region, World Bank

    Google Scholar 

  • World Bank (2005) Technical annex on a proposed credit to the Government of India for an emergency tsunami reconstruction project. World Bank

    Google Scholar 

  • World Bank and ADB (2001) Gujarat earthquake recovery program: assessment report. World Bank, New Delhi

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to V. Thiruppugazh .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2014 Springer Japan

About this chapter

Cite this chapter

Thiruppugazh, V. (2014). Post-Disaster Reconstruction and Institutional Mechanisms for Risk Reduction: A Comparative Study of Three Disasters in India. In: Shaw, R. (eds) Disaster Recovery. Disaster Risk Reduction. Springer, Tokyo. https://doi.org/10.1007/978-4-431-54255-1_2

Download citation

Publish with us

Policies and ethics