Skip to main content

Planning and Procedural Aspects of the Windfarm Project of the Dutch Electricity Generating Board

  • Chapter
Social Decision Methodology for Technological Projects

Part of the book series: Theory and Decision Library ((TDLA,volume 9))

  • 211 Accesses

Abstract

This chapter gives the full story of the preparatory and executive decision making processes concerning a novel and noncontroversial electric-power project: the siting of an experimental wind turbine park. The author’s contribution proper starts at Section 1.1. By way of an editorial preface we (Ch.V. and G.Cv.) would like to note beforehand that roughly two phases appeared to be necessary which seem to have been conducted to the satisfaction of the several parties involved (see Section 4),

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  • Begeleidingscommissie Voorstudie Plan Lievense. (1981). Windenergie en waterkracht (Wind energy and hydro-power), ‘s-Gravenhage, mei.

    Google Scholar 

  • Keeney, R.L. and Raiffa, H. (1976). Decisions with multiple objectives: preferences and value trade-offs. New York: Wiley.

    Google Scholar 

  • N.V. Sep (1983). Locatievoorstel proefwindcentrale (Siting proposal experimental windfarm), Arnhem, januari.

    Google Scholar 

  • Roy, B. (1968). Classement et choix en présence de critères multiples (La méthode ELECTRE 1). Revue Informatique et Recherche Opérationelle, 8, 57–75.

    Google Scholar 

  • Voogd, J.H. (1980). Multi-criteria-methoden voor ruimtelijke evaluatie-onderzoek (Multicriteria methods for evaluation in physical planning). Planologisch Studiecentrum TNO, Delft.

    Google Scholar 

  • Tweede Kamer der Staten Generaal. (1982). Windenergie en opslag (Wind energy and storage), sitting 1981–1982, 17.500, nrs. 1–2, ‘s-Gravenhage, juli.

    Google Scholar 

  • Zeleny, M. (1982). Multiple criteria decision making. New York: McGraw-Hill.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 1989 Kluwer Academic Publishers

About this chapter

Cite this chapter

Lubbers, F. (1989). Planning and Procedural Aspects of the Windfarm Project of the Dutch Electricity Generating Board. In: Vlek, C., Cvetkovich, G. (eds) Social Decision Methodology for Technological Projects. Theory and Decision Library, vol 9. Springer, Dordrecht. https://doi.org/10.1007/978-94-009-2425-3_11

Download citation

  • DOI: https://doi.org/10.1007/978-94-009-2425-3_11

  • Publisher Name: Springer, Dordrecht

  • Print ISBN: 978-94-010-7593-0

  • Online ISBN: 978-94-009-2425-3

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics