Abstract
This chapter is concerned with the routine control of the closed circuit in the wet-grinding section of the plant. Sampling control, as designed to check the state of the pulp at critical stages in its treatment and end- product disposal, is discussed more fully in Chapter 23. Control of the closed circuit has three aspects:
-
(a)
Immediate running control.
-
(b)
Long-term quality control, as it affects assay grades.
-
(c)
Capacity control, which considers wear rates and economic throughput.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Reference
Ramsey, R. H. Eng. Min. J., 146.
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 1965 Elsevier Publishing Company Limited
About this chapter
Cite this chapter
Pryor, E.J. (1965). Grinding Circuit Control. In: Mineral Processing. Springer, Dordrecht. https://doi.org/10.1007/978-94-010-2941-4_10
Download citation
DOI: https://doi.org/10.1007/978-94-010-2941-4_10
Publisher Name: Springer, Dordrecht
Print ISBN: 978-94-010-2943-8
Online ISBN: 978-94-010-2941-4
eBook Packages: Springer Book Archive